Similar Projects
Abbe Road North Refrigerated Warehouse
New Construction, Infrastructure - 150,000 SF
Conception
$24,340,000 CJ est. value
Sheffield Lake, OH 44054

Abbe Road North Refrigerated Warehouse
New Construction, Infrastructure - 150,000 SF
Conception
$24,340,000 CJ est. value
Sheffield Lake, OH 44054

Grande Esplanade
New Construction, Infrastructure
Design
$5,500,000 CJ est. value
North Ridgeville, OH 44039

Roadway Minor Rehab
Infrastructure
Design
$1,487,000 CJ est. value
Elyria, OH 44035

City of Avon, New Construction of Park Restrooms
New Construction, Infrastructure
Bidding
$784,100 CJ est. value
Avon, OH 44011

RFQ Engineering - Improvements of the Black River Wastewater Plant Digester
Renovation, Infrastructure
Bidding
$8,000,000 CJ est. value
Lorain, OH 44052

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Paving Various Columbia Township Roads
Results
Columbia Station, OH

Penny Lane Resurfacing
Results
$51,472 est. value
LaGrange, OH

Noveon/Lubrizol Building Addition
Addition, Demolition, Infrastructure - 1,856 SF
Pending Verification
$1,000,000 CJ est. value
Avon Lake, OH 44012

Detroit Road Mixed Use
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Avon, OH 44011

SR 134 - Bridge Preservation
Demolition, New Construction, Infrastructure
Design
$530,000 CJ est. value
Martinsville, OH 45146

The Partial Removal and Replacement of Sidewalks at Admiral King, Hawthorne and Garfield
Infrastructure
Bidding
$395,204 CJ est. value
Lorain, OH 44052

RFQ Design - New Fire Station Facility
New Construction, Infrastructure - 12,000 SF
Post-Bid
$3,000,000 CJ est. value
Grafton, OH 44044

Last Updated 11/22/2022 02:32 PM
Project Title

Mechanic Street / Crook Street Improvements Phase 2 - Rebid

Physical Address View project details and contacts
City, State (County) Grafton, OH 44044   (Lorain County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,509,019 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work consists of the installation of approximately 1,785' of 10" and 738' of 8" Sanitary Sewer, 1,120' of 24" and 2,068' of 12" Storm Sewer, together with all necessary excavation, bedding, backfill, asphalt pavement repair for trenches, manholes, catch basins, 6" service laterals, 7,800 SY pavement planing and resurfacing, restoration, and other necessary appurtenances. The bid guaranty may be of two forms: 1. A Bid Guaranty and Contract Bond using the form in the Contract Documents. (The amount of the bid does NOT have to appear on this form.) 2. A certified check, cashier's check or letter of credit in favor of the Village of Grafton, Ohio, in the amount of 10% of the bid. If the contract is awarded, a Contract Bond will be required, which is a 100% payment and performance bond. After the award of the contract let by competitive bid and prior to the time the contract is entered into, bidders shall submit the affidavit required under the Ohio Revised Code, Section 5719.042 that the bidder was not charged with any delinquent personal property taxes in Lorain County, Ohio. The successful bidder will be required to pay not less than the minimum wage rates established by the Department of Industrial Relations of the State of Ohio. The Village of Grafton, Ohio reserves the right to reject any and all bids, to waive any irregularity in any bid, and to determine the lowest and best bidder.DOMESTIC STEEL AND MADE IN USA PRODUCTS WILL BE REQUIRED TO BE PROVIDED/USED FOR ALL MATERIAL ASPECTS/COMPONENTS OF THIS PROJECT.No bidder may withdraw his bid for a period of 90 days after the scheduled closing time for the receipt of bids. This project is being partially funded by Ohio Public Works Commission (OPWC) funds and Ohio Water Development Authority (OWDA). 217000-00330 The opinion of the probable cost of construction is $1,618,000.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents