Similar Projects
Annual Job Order Contract for On-Call HVAC Services - Citywide
Bidding
San Antonio, TX

Condenser Water Filtration System Upgrade
Bidding
San Antonio, TX 78226

Cooling Towers Cleaning Services - BESD
Post-Bid
San Antonio, TX 78200

JBSA Fire Extinguisher/Fire Suppression System/UV System Maintenance and Kitchen Exhaust/Hood Duct Cleaning and Repair
Post-Bid
Randolph, San Antonio, TX

Annual Contract - Cooling Towers Cleaning Services
Term Contract
Results
San Antonio, TX

Repair HVAC, Building #1151 @ Kelly Field Annex, Joint Base San Antonio Lackland AFB
Results
$250,000 to $500,000 est. value
San Antonio, TX 78236

Randolph AFB-Install HVAC In Hangar 74
Bidding
$500,000 to $1,000,000 est. value
JBSA Randolph, Randolph, TX

Mountain Valley Middle School HVAC
Post-Bid
Less than $2,700,000 est. value
New Braunfels, TX 78132

WSD SAT CR3 Upgrade
Results
San Antonio, TX 78226

Burning Tree Apartments Exterior Improvements and New HVAC and Water Heaters
Post-Bid
$2,700,000 to $3,700,000 est. value
San Antonio, TX 78247

District Cooling System Business Case Consulting Services
Results
Less than $125,000 est. value
San Antonio, TX 78212

S--Exhaust Hood Cleaning Service 671-20-2-5041-0005
Post-Bid
San Antonio, TX 78229

Vent Hood Cleaning Services
Term Contract
Results
Less than $10,000 est. value
San Antonio, TX 78200

RFI Cooling Tower
Post-Bid
San Antonio, TX

Annual Contract for Cooling Tower Service Program
Term Contract
Results
Less than $98,600 est. value
San Antonio, TX 78212

Reported 11/16/2019 12:00 AM
Project Title

DM FY20 Multipledisciplinary Studies Building (MS) HVAC Clean High and Low Pressure Ducts and Related Work

Physical Address View project details and contacts
City, State (County) San Antonio, TX   (Bexar County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work constrict of cleaning high-pressure ducts at the Multidisciplinary Studies Building (MS), inside Air Handling Units (AHU) 44, 45, 46 and 47 and low-pressure ducts in all Variable Air Volume (VAV) boxes in MS. 1. All low-pressure dusts will be sealed with Environmental Protection Agency (EPA) approved sealers for Air Streams. 2. After low-pressure ducts are cleaned, temporary filter will be placed inside the air diffusers to prevent any debris from coming out. 3. The temporary filters will removed at end of the project. 4. A two years warranty shall be offered for all labor and materials used as part of this project.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents