Similar Projects
Treated Water Booster Pumps
Alteration
Results
CA

Groundwater Flush to Waste Project
Infrastructure
Results
Sacramento, CA 95838

CA-Stone Lakes NWR-Pumps Rehab
Term Contract
Results
Elk Grove, CA

Install Chill Water Pumps
Term Contract
Post-Bid
CA 95652

Big Horn Groundwater Well 7 Downhole Construction
Infrastructure
Post-Bid
$1,280,000 est. value
Elk Grove, CA 95757

Seasons Well (W-41) Pump Rehabilitation Project
Infrastructure
Results
$110,000 est. value
Sacramento, CA

Relief Wells Inspection and Rehabilitation, Phase II
Infrastructure
Results
Sacramento, CA 95815

38--Folsom Dam Backup Emergency Pump, Motor and Coupler
Term Contract
Post-Bid
Folsom, CA

FWTP Well Testing and Design
Infrastructure
Post-Bid
Sacramento, CA 95826

Well Destruction Program
Demolition
Results

Legends Well (W-76) Rehabilitation
Infrastructure
Results
$120,000 est. value
Sacramento, CA

Mather Housing Well Rehabilitation
Infrastructure
Results
$100,000 est. value
Mather, CA 95655

Well Site Feasibility
Infrastructure
Post-Bid
Sacramento, CA

On Call Drilling and Well Installation Services for City Landfills
Term Contract
Results
Sacramento, CA 95811

Mojave Drive and Bellflower Street Dry Well Project
Infrastructure
Bidding
$30,000 est. value

Last Updated 02/15/2022 05:05 AM
Project Title

On-Call Drilling and Well Installation Services for City Landfills

Physical Address View project details and contacts
City, State (County) Sacramento, CA   (Sacramento County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Pumps and Wells, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this Request for Qualifications (RFQ) is to have contractors available to perform on call services at each landfill, as well as other closed landfill areas. The work may be related to regulatory compliance orders including, but not limited to, the following: •Installation of permanent landfill gas (LFG) extraction or compliance monitoring wells; •Installation of permanent groundwater monitoring wells; •Installation of piezometers placed through the waste units into groundwater; •Installation of direct push borings to collect groundwater samples; and •Installation of condensate traps.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents