Similar Projects
Dixie Highway/NW Alice Street Intersection Improvements Project
Bidding
Stuart, FL 34994

Tree Selection and Replacement for East Ocean Boulevard Streetscape Phase 1
Bidding
Stuart, FL

Tree Trimming
Post-Bid
Less than $75,000 est. value

Landscaping
Post-Bid
Less than $600,000 est. value

Cove Road Box Culvert Replacement
Results
$628,000 est. value
Stuart, FL 34996

Cove Road Resurfacing (Sr-76 to Us-1)
Results
$1,100,000 est. value
Stuart, FL 34996

Hungryland Wildlife and Environmental Area Mechanical Vegetation Treatment
Term Contract
Post-Bid
Less than $100,000 est. value

Heritage Ridge (Phase 2) Drainage Improvements
Results
Less than $770,000 est. value
Stuart, FL 34996

Lychee Erinose Mite Treatment
Term Contract
Post-Bid
Delray Beach, Melbourne Beach, Merritt Island, Palm Beach, Palm City, West Palm Beach, FL 32952

Asphalt Repair
Results
Less than $600,000 est. value

Lawn Maintenance
Term Contract
Post-Bid
$45,000 to $50,000 est. value
Stuart, FL 34994

Roadway Resurfacing
Results
Stuart, FL 34996

Vegetation Management, Florida & South Atlantic Division
Post-Bid
$25,000 to $35,000,000 est. value

Savannah Road Resurfacing and Bike Lanes
Results
Less than $1,000,000 est. value
Jensen Beach, FL

SMRU WWTP Lawn Maintenance Project
Post-Bid
Hobe Sound, FL 33455

Last Updated 03/24/2020 03:45 PM
Project Title

Mapp Road Town Center

Physical Address View project details and contacts
City, State (County) Stuart, FL 34996   (Martin County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Landscaping/Irrigation, Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Streetscaping of the Mapp Road corridor between SW Martin Highway (CR-714) and SW Martin Downs Boulevard (SR-714) including stormwater, on-street parking, landscaping, irrigation, wide sidewalks, medians, and concrete paver areas. The Mapp Road Town Center Improvements Project is a 0.71-mile-long roadway and Town Center project that extends from 0.51 miles north of SW Martin Highway (CR-714) to SW Martin Downs Boulevard (SR-714) in Palm City, Florida.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents