Similar Projects
Lido Key Hurricane Storm Damage Reduction Project Sarasota County, Florida
Post-Bid
$20,000,000 to $30,000,000 est. value
Sarasota, FL 34230

Lido Key Hurricane Storm Damage Reduction Project Sarasota County, Florida
Post-Bid
$20,000,000 to $30,000,000 est. value
Sarasota, FL 34230

CBJTC Precinct Road North Culvert Replacement
Results
Less than $500,000 est. value
Starke, FL 32091

CBJTC North Tank Trail Emergency Repair
Results
Less than $350,000 est. value
Starke, FL

Canal Maintenance Services
Term Contract
Post-Bid
Miami, FL 33128

CBJTC East Bay Road Washout Repair
Results
Less than $500,000 est. value
Starke, FL 32091

Washington County Concrete Drainage Features
Post-Bid
Chipley, FL 32428

CBJTC Gulfport Street Washout Repair
Results
Less than $420,000 est. value
Starke, FL 32091

Construction Services for Poitras East Community Development District
Post-Bid
FL

CBJTC Mosley Road Washout Repair
Results
Less than $500,000 est. value
Starke, FL 32091

Kaicasa - Concrete Box Culvert
Post-Bid
Immokalee, FL

CBJTC Prison Camp Road Washout Repair
Results
Less than $300,000 est. value
Starke, FL 32091

10/1366DN EGLIN NON-POINT SOURCE PROJECT OKALOOSA / W
Post-Bid
Eglin AFB, FL

Seawall Repair
Results
Everglades, FL

Sweetwater Drainage Improvements: Phase 8A
Post-Bid
Sweetwater, FL 33174

Last Updated 01/31/2020 10:05 AM
Project Title

Cove Road Box Culvert Replacement

Physical Address View project details and contacts
City, State (County) Stuart, FL 34996   (Martin County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $628,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Cove Road Box Culvert Replacement project is a concrete box culvert removal and replacement project on SE Cove Road. The project is located on SE Cove Road over Manatee Creek (approximately 0.12 miles east of the Dixie Highway – Cove Road roundabout). The complete project scope includes removal and replacement of the box culvert with a precast concrete arch bridge structure, clearing and grubbing, guardrail, resurfacing improvements, signing and pavement markings, water main relocation, sodding, maintenance of traffic controls, erosion and sedimentation control measures, and other incidental work.

Details

Division 33 - Utilities, Culverts, Pipe Culverts, Public Pipe Culverts, Concrete Culverts, Precast Concrete Culverts, Cast-in-Place Concrete Culverts.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents