Similar Projects
Master Planning for the U.S. Capitol Complex
Design
$1,000 to $25,000,000 est. value
Washington, DC 20515

Master Planning for the U.S. Capitol Complex
Design
$1,000 to $25,000,000 est. value
Washington, DC 20515

RFQ Design - Sprinkler System Improvement
Term Contract
Bidding
$15,000,000 CJ est. value
Washington, DC 20036

Architectural/Engineering Services for Fort Lincoln Park, Theodore Hagans Cultural Center and New Recreation and Early Childhood Education Center
Post-Bid
Washington, DC 20018

Architectural/Engineering Services for Fort Lincoln Park, Theodore Hagans Cultural Center and New Recreation and Early Childhood Education Center
Post-Bid
Washington, DC 20018

DIA Task Order Construction Contract (DDOC)
Renovation
Results
$1,000 to $30,000,000 est. value
Washington, DC 20340

DIA Task Order Construction Contract (DDOC)
Renovation
Results
$1,000 to $30,000,000 est. value
Washington, DC 20340

Provide Independent Quality Assurance Oversight and Management Over All Engineering and Construction Activities
Renovation, Term Contract
Design
DC

National Guard Bureau, Region 3, Architect and Engineering Indefinite Delivery Indefinite Quantity Contract for Vertical Projects
Post-Bid
$75,000 to $30,000,000 est. value

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

JBAB Construction Strategic-Sourcing
Term Contract
Design
$80,000,000 est. value
Washington, DC

Engineering, Planning and Development
Post-Bid

C--Commissioning Authority (CXA) Services for the EPA
Results
$25,000 to $100,000,000 est. value

RFQ - National Capital Seawall A/E IDIQ
Renovation
Post-Bid
$25,000 CJ est. value
Denver, CO 80202

IDIQ A/E Civil Structural NAVFAC Washington
Results
$150,000 to $15,000,000 est. value

Last Updated 12/21/2022 09:11 AM
Project Title

RFQ Engineering - Professional (Site Work)

Physical Address View project details and contacts
City, State (County) Washington, DC 20005   (District of Columbia County)
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids
Project Status Request for Qualifications, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Rockingham Housing Authority (RHA) is requesting qualifications from qualified professional firms for design, bid developments and contract administrative services in connection with: 1. Site and unit Handrails installation and replacements 2. Site stairs repair / replacements 3. Replacement of Retainage Walls 4. Erosion Control throughout property 5. Fence Removal 6. Evaluation of Sidewalk repair / replacement 7. Playground repairs 8. Evaluation of property trees. The Method of Contractor Selection has not been determined at this time.

Details

Division 01 - General Requirements.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 11 - Equipment.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.
Division 27 - Communications.
Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents