Project Title | Santa Barbara Boulevard & Cape Coral Parkway Intersection Improvements |
Physical Address | View project details and contacts |
City, State (County) | Cape Coral, FL (Lee County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Contractor to furnish all labor, materials, equipment, and operations necessary to complete the following roadway work: milling, resurfacing, sidewalk, curb and gutter, storm drainage inlet and striping on Santa Barbara Boulevard and Cape Coral Parkway Intersection (see Exhibit D, Project Plans). In addition to other items as outlined in the specifications and bid documents, the intersection improvements may consist, but shall not necessarily be limited to all or part of the following: - All maintenance of traffic. - Notification to public safety departments of work within the right-of-way that would result in detours of emergency vehicles. - Clipping and herbicide for paving preparation. - Scraping material from edge of road to establish even pavement edge and provide drainage from the roadway surface to the adjacent swale drainage system. - Milling of existing roadway surface. - Leveling of existing roadway surface. - Roadway excavation, stabilized subgrade, and base to construction full depth pavement. - Adjustment of existing utilities to match new pavement elevations. - Replacement of sidewalk and curb and gutter. - Replacement of curb drain inlet. - Removing the existing pedestrian refuge island. - Replacement of ramps to comply with ADA. - Delivery of material to site (hauling). - Application of prime and/or tack coat(s). - Superpave Type SP-9.5 asphalt Overlay. - Superpave Type SP-12.5 asphalt Overlay. - Replacement of any existing Pavement Marking and RPM’s. - Street sweeping, as necessary, & final clean-up of job site and repair of any damage caused by paving activities. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |