Similar Projects
RFQ Developer - Facility Condition Assessment for Lane County Parks
Renovation, Infrastructure
Conception
$500,000 CJ est. value
Eugene, OR 97401

Martin Luther King Jr. Boulevard Transit and Safety Improvements - City of Eugene
Infrastructure
Conception
$600,000 CJ est. value
Eugene, OR 97401

28th Street: Main St to Olympic St (Springfield)
Infrastructure
Design
$1,716,000 est. value
Springfield, OR 97475

S. 28th Street Dust Mitigation (Springfield)
Infrastructure
Design
$1,289,156 CJ est. value
Springfield, OR 97477

Susan Campbell Sidewalk Improvement Project
Infrastructure
Post-Bid
Eugene, OR 97403

Downtown Riverfront Southern Access and Parking
Infrastructure
Post-Bid
$2,300,000 to $2,700,000 est. value
Eugene, OR 97408

OR47/Territorial RD Curb Ramps (Carlton/Veneta) Project On The Tualatin Valley
Infrastructure
Results
$2,000,000 to $5,000,000 est. value

OR569: Green Hill Rd - Coburg Rd (Eugene) Section of the Beltline and Eugene-Springfield Highway (Rt. No. OR569 and I-105) in Eugene
Infrastructure
Results
$10,000,000 to $20,000,000 est. value
Eugene, OR

YMCA / Eugene
New Construction, Infrastructure
Construction
$34,000,000 CJ est. value
Eugene, OR 97405

Microtel by Wyndham
New Construction, Infrastructure - 37,256 SF
Pending Verification
$12,000,000 CJ est. value
Florence, OR 97439

Microtel by Wyndham
New Construction, Infrastructure - 37,256 SF
Pending Verification
$12,000,000 CJ est. value
Florence, OR 97439

Lincoln Street Protected Bike Lanes - City of Eugene
Infrastructure
Conception
$1,288,000 CJ est. value
Eugene, OR 97401

Coburg Loop - N. Coburg Industrial Way
Infrastructure
Design
$499,877 CJ est. value
Fall Creek, OR 97438

Camas Ridge Community Elementary School
New Construction, Demolition, Infrastructure - 74,500 SF
Post-Bid
$17,000,000 est. value
Eugene, OR 97403

OR58: Salt Creek Tunnel to MP 70 Section of the Willamette Highway (Rt. No. OR58) Near Odell Lake
Infrastructure
Results
$5,000,000 to $10,000,000 est. value

Last Updated 04/03/2023 07:34 PM
Project Title

High Street Protected Bikeway

Physical Address View project details and contacts
City, State (County) Eugene, OR 97405   (Lane County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,854,240 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work for this contract includes: Concrete sidewalk and sidewalk ramps; Asphalt pavement repairs; Concrete traffic separator curb; Permanent pavement markings and signs; Permanent traffic signalization; Permanent lighting; Permanent landscaping repair; Temporary pedestrian and traffic control; Temporary erosion control. Inquiries regarding the plans, specifications, and contract documents shall be made to: Bryan Root - 541-501-0378 or broot@eugene-or.gov. PROJECT #985784 BID #3

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents