Similar Projects
Last Updated | 01/06/2023 12:11 AM |
Project Title | Milling and Resurfacing - Suncoast Ii (Sr589) - Sr 44 to Cr 486 |
Physical Address | View project details and contacts |
City, State (County) | Lecanto, FL 34446 (Citrus County) |
Category(s) | Heavy and Highway, Outdoor Lighting, Sewer and Water |
Sub-Category(s) | Bridge, Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development, Water Lines |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Contract Award, Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $102,999,958 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Counties: Citrus Road Name: Suncoast Ii (Sr589) - Sr 44 to Cr 486 Limits: 02470000 Project(s): 44276415201(*) Federal Aid No: N/A Total Roadway Length: 3.000 Miles Contract Days: 1277 Total Bridge Length: 0.242 Miles Total Proposal Length: 3.242 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 30 Work consists of providing all labor, materials, equipment and incidentals necessary for construction of SR 589 (Suncoast Parkway 2) including roadway, drainage, signing and pavement markings, lighting, signalization, ITS, bridge structures, toll facilities and landscaping, from south of SR 44 to CR 486, milepost 67.227 to milepost 70.276, in Citrus County. For projects in excess of $50 million, in addition to meeting all other qualification requirements of Section 337.14, Florida Statutes, and Rule Chapter 14-22, Florida Administrative Code, any Contractor who is not prequalified and in good standing with the Department as of January 1, 2019, must submit evidence which demonstrates satisfactory completion of at least two projects, each in excess of $15 million, for the Florida Department of Transportation or for any other state department of transportation. Acceptability of the evidence related to the two projects is at the sole discretion of the Department. No Pre-Bid Conference. Contractor must be prequalified For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order 001 Milling and Resurfacing |
||||||||||||||||||||||
Details |
|
||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |