Similar Projects
Last Updated | 09/27/2022 09:20 AM |
Project Title | RFQ Construction Manager at Risk - 16-Inch Water Line in Verrado between Van Buren and Yuma Road with Pressure Release Valve and Epcor Water Line Interconnect at Dean and McDowell |
Physical Address | View project details and contacts |
City, State (County) | Buckeye, AZ 85396 (Maricopa County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Construction Management - CM at Risk, Competitive Bids |
Project Status | Bidding, Request for Qualifications, Construction start expected February 2023 , Construction documents |
Bids Due | View project details and contacts |
Estimated Value | $3,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As per the Owner the project has been cancelled. Editorial Content Team is actively seeking updated information Generally, this Project will require the design and construction using the Construction Manager at Risk delivery method of a 16-inch water line and PVR to connect the existing 16-inch water line at Verrado and Van Buren with the existing 16-inch water line at Verrado and Yuma. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |