Similar Projects
Construction Services for Project Improvements (Phase 2)
Bidding
Lakeland, FL

Asphalt Repair
Bidding
$273,000 est. value
FL

Construction Services for Project Improvements (Phase 1)
Post-Bid
Lakeland, FL 33801

Construction Services for Project Improvements (Phase 1)
Post-Bid
FL

Polk Parkway Widening, MP 18-22, and Polk Parkway Resurfacing
Results
Less than $58,761,798 est. value
Auburndale, FL 33823

Construction of Asphalt Parking and Grading
Results
$75,000 est. value
Bartow, FL

Construction Services for Project Improvements Phase 3D also known as Riverstone Phases 5 and 6
Post-Bid
FL

I-4 at 557 Interchange
Results
FL

Railroad Crossing Asphalt Repairs
Post-Bid
Frostproof, FL 33843

Eagle Lake 2019 Resurfacing Project
Results
Eagle Lake, FL 33839

Annual Cape Seal Treatments for Public Works Construction and Maintenance
Term Contract
Post-Bid
Lakeland, FL 33801

Milling and Resurfacing / 3D Model Delivery and Automated Machine Guidance (AMG)
Results
Less than $16,655,393 est. value
FL

Osprey Unit Road Capping
Post-Bid
Less than $130,000 est. value
Polk City, FL

Repaving Railroad Crossings
Results
Lake Alfred, FL 33850

Tenoroc Public Use Area Road/Parking Maintenance
Post-Bid
Lakeland, FL 33805

Last Updated 11/25/2019 02:45 PM
Project Title

Provide and Install FDOT Recycled Asphalt Mix - Rolling Hills Cemetery

Physical Address View project details and contacts
City, State (County) Winter Haven, FL 33880   (Polk County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,000 to $14,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

- Contractor to provide and install approved FDOT Recycle Asphalt mix equal to or better than Type SP-TL-C 9.5 Recycled Asphalt. - Asphalt to be installed at 1.50” or greater thickness. - Asphalt to be installed on existing milling base road. Existing road way is 850(+-) SY’s. Contractor responsible for performing actual field measurements to verify total square yards (SY) provided. Contractor responsible for notifying the Parks, Grounds, & Cemetery Superintendent immediately if field dimensions are different than the total square yards provided. - Pricing to be submitted as a Unit Price per SY Proposal and Total Project Cost. - Contractor responsible for ensuring positive drainage from road. Contractor responsible for leveling of base to ensure no dips or potholes of finish product. - Contractor responsible for work stoppage when funeral services are performed within cemetery. City will make everyone effort to schedule accordingly around paving schedule, however; if a funeral service occurs during the scheduled work time, the contractor will be required to stop work during the funeral service.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents