Similar Projects
Last Updated | 02/12/2019 03:08 PM |
Project Title | Clapper Road WTP Improvements |
Physical Address | View project details and contacts |
City, State (County) | Delmar, NY 12054 (Albany County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Separate Bid Packages Contract No. 1A - General Construction Contract No. 1B - Mechanical Construction Contract 1C - Electrical Contract No. 1A - General Construction consists of, but not limited to, the following: Treatment plant improvements including the decommissioning and refurbishing of existing waste washwater lagoons, construction of a new pretreatment DAF Facility (Pretreatment Building), decommissioning of existing Ozone equipment and Ozone contact tank, Installation of carbon dioxide generation panels and associated equipment in the existing Ozone Building, installation of aeration equipment and sodium n permanganate storage and feed equipment in a new prefabricated building upstream of the raw water basin (SPOX Building). The work in the existing Filter Building includes but is not limited to refurbishing Trident filters, Replacing the raw water basin pumps, replacing the static mixer, and replacing PLC. The work also includes integrating the SCADA for the new equipment with the existing plant controls. Contract No. 1B - Mechanical Construction consists of, but not limited to, the following: Heating, Ventilation and Air Conditioning (HVAC) associated with the Pretreatment Building and Modifications to the existing Ozone Building. Includes: connection to existing water mains, mechanical identification, mechanical piping, plumbing, oil fired heating system, mechanical equipment, ductwork, testing and balancing air and oil systems. Contract No. 1C - Electrical Construction: General demolition of existing equipment and installation of panels, wiring, conduits, and other associated electrical work in the construction of the pretreatment | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |