Similar Projects
Wastewater Treatment Plant Flood Mitigation
Bidding
Endicott, NY 13760

Waste Water Treatment Facility Long Term Improvement Project
Sub-Bidding
Oneida, NY 13421

Water Treatment Plant Residuals Management Improvements
Post-Bid
Binghamton, NY 13903

Metropolis Country Club Pump House
New Construction - 1,000 SF
Post-Bid
Less than $500,000 CJ est. value
White Plains, NY 10607

Clapper Road WTP Improvements
Results
Delmar, NY 12054

Phase 1 Water Pollution Control Facility Improvements Contract-1
Results
$8,000,000 to $9,000,000 est. value
Webster, NY

Hyde Park Condominiums WWTF
New Construction
Construction
$1,000,000 to $1,500,000 est. value
Hyde Park, NY 12538

Pump Station Upgrades - SRMT Diabetes Center
Renovation
Construction
$69,833 est. value
Akwesasne, NY 13655

Lake Deforest Water Treatment Plant Upgrades
Renovation
Pending Verification
West Nyack, NY 10980

Hudson Place Mixed Use
New Construction - 25,000 SF
Pending Verification
Newburgh, NY 12550

Water System Improvement Project
Post-Bid
Downsville, NY

New Baltimore WWTP Upgrades
Results
Less than $1,800,000 est. value
New Baltimore, NY 12124

Water Pollution Control Facility Upgrades - Phase II
Construction
Westfield, NY 14787

Manganese Removal Treatment Plant/Electrical/Telemetry
Post-Bid
Gilbertsville, NY 13776

Waste Management Steam Boiler Replacement
Renovation
Results
$290,000 to $310,000 est. value
Ithaca, NY 14853

Reported 02/01/2019 12:00 AM
Project Title

Wastewater Treatment Plant Improvements Phase 3

Physical Address View project details and contacts
City, State (County) Mexico, NY 13114   (Oswego County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect/Engineer
Owner View project details and contacts
Architect View project details and contacts
Description Contract 1 - General Construction Contract 2 - HVAC Contract 3 - Plumbing Contract 4 - Electrical Replacement of structural members and the sludge and scum collection mechanisms within the existing wastewater treatment tanks, replacement of existing piping and valves and construction of an ultraviolet disinfection facility at the wastewater treatment plant.
Details
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents