Similar Projects
Washington County Concrete Drainage Features
Post-Bid
Chipley, FL 32428

CR 276 Alford Road Paved Shoulders and Resurfacing Project
Post-Bid
FL

Drainage Repairs
Results
Less than $225,000 est. value

West Boulevard Roadway Improvements Project
Results
Chipley, FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Grassing, Seeding, Sodding
Results
Less than $500,000 est. value

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Drainage
Results
Less than $200,000 est. value

Washington County - Joiner Road Culvert Replacement
Infrastructure
Post-Bid
Chipley, FL 32428

Add Lanes and Reconstruct/Flexible Paving/Milling and Resurfacing/Drainage Improvements
Results
Less than $34,782,537 est. value
FL

Construction of Peel Road, Earl Gilbert Road, Toole Circle, Cheverie Circle, Coon Hollow Trail, Hartzog Road, Waller Road, Laster Road, and Sweet Bay Road
Infrastructure
Post-Bid
Chipley, FL

Safety Project/Add Turn Lanes/Traffic Signals/Drainage Improvements
Results
Less than $265,041 est. value

Drainage
Results
Less than $300,000 est. value

FEMA Road Repairs
Results
Chipley, FL 32428

Drainage
Results
Less than $400,000 est. value

Last Updated 07/19/2021 12:38 PM
Project Title

Washington County - Pine Ridge Drive Mitigation Project

Physical Address View project details and contacts
City, State (County) Chipley, FL 32428   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The reconstruction of a portion of Pine Ridge Drive in Washington County from for a total project length of 458 linear feet. Also included in this project is resurfacing, driveway reconstruction and harmonizing, shoulder construction, clearing and grubbing, and grassing. Drainage improvements are also included consisting of the a cross drain pipe culvert and a side drain pipe culvert along with concrete mitered end sections.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents