Similar Projects
Alley Reconstruction: Dandelion Ln/Trumpet Dr & Thistle Ln/Daisy Ln
Post-Bid
$650,000 to $750,000 est. value
Rowlett, TX 75088

Trinity Crossing Phase 6A Paving Improvements
Post-Bid
Mesquite, TX

Erosion Control at Various Locations - Phase 1
Results
$4,522,689 est. value
Dallas, TX 75201

Street Reconstruction Group - 17-1006
Results
$1,518,259 est. value
Dallas, TX 75201

Asphalt, Concrete, Patching, Paving and Curbs
Post-Bid
Carrollton, TX

Alley Reconstruction - Group No. 17-8004
Results
$1,122,615 est. value
Dallas, TX 75201

McKinney Avenue/Cole Two-Way Conversion
Post-Bid
Dallas, TX 75295

Brownwood Park - Erosion Control Improvements
Results
$300,000 est. value
Dallas, TX 75201

Erosion Control at Various Locations - Phase 2
Post-Bid
Dallas, TX

Baylor Area, Fair Park, East Dallas Multimodal Connectivity Phase 1-A
Results
Less than $300,000 est. value
Dallas, TX

2019 Alley Improvements
Infrastructure
Post-Bid
Less than $205,000 est. value
DeSoto, TX 75115

Denton Tap Intersection Improvements
Results
$2,777,148 est. value
Coppell, TX 75019

Windsor Ridge Wall Repair
Alteration
Post-Bid
Irving, TX

Quiet Zone - Northeast Dallas
Results
$479,493 est. value
Dallas, TX

Sam Rayburn Tollway Frontage Road Concrete Pavement Joint and Crack Sealing
Term Contract
Post-Bid
Carrollton, TX 75008

Reported 06/04/2022 12:00 AM
Project Title

Paving and Drainage Improvments Street Reconstruction Group 17-5002

Physical Address View project details and contacts
City, State (County) Dallas, TX 75217   (Dallas County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $4,900,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

CIZ22-PBW-2040 - Street Reconstruction Group 17-5002 Hodde Street from Woodmont Drive to North Jim Miller Road - PB17V204 Rayenell Avenue from Hodde Street to C.F. Hawn Service Road - PB17V205

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents