College/University, LEED Certified Construction Project Lead, Gainesville, FL 32611 (Alachua County)
Reported | 07/07/2021 10:36 AM |
Project Title | UF-200 New Public Safety Building and Centrex Building Renovation |
Physical Address | View project details and contacts |
City, State (County) | Gainesville, FL 32611 (Alachua County) |
Category(s) | Education, Green Building |
Sub-Category(s) | College/University, LEED Certified |
Contracting Method | |
Project Status | Construction Commenced April 2021 |
Bids Due | View project details and contacts |
Estimated Value | $20,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | New 50,972 SF, 3-story tilt-up concrete and structural steel building and 6,931 SF renovation of existing the Centrex Building. Anticipated Bid Packages: Testing Laboratory Services; Acoustical Ceilings; Window Treatment; Surveying; Specialty Flooring; Casework & Cabinets; Final Cleaning; Resinous Flooring; Pre-Engineered Metal Buildings; Demolition & Selective Demolition; Athletic Flooring; Elevators; Concrete & Tilt-Up Concrete Work; Carpet & Resilient Flooring; Fire Suppression Systems; Masonry Work; Access Flooring; Plumbing; Structural & Miscellaneous Steel; Painting & Wallcovering; HVAC; Column Covers; Building Specialties; HVAC Test & Balance; Metal Fabrications, Stairs & Railings; Fixed Sound Absorption Panels; HVAC Controls; Millwork & Architectural Woodwork; Signage & Plaques; Electrical; Waterproofing & Sealants; Operable Partitions; Communications Systems; Membrane Roofing; Toilet Partitions; A/V Systems & Equipment; Doors & Hardware; Toilet & Bath Accessories; Security & Alarm Systems; Overhead Coiling Doors; Fire Protection Specialties; Site Work & Site Utilities; Glass & Glazing; Lockers; Unit Pavers & Hardscaping; Framing & Drywall; Storage Shelving; Fences & Gates; Plaster & Stucco; Protective Covers and Sun Control; Site Furnishings; Hard Tile; Detention Equipment; Landscaping & Irrigation. Construction Start: 4/8/2021 - Early Site Package; 7/6/2021 - Main Building. Substantial Completion: 7/11/2022; Final Completion: 8/10/2022 |
||||||||||||||||||||||||||||||||||||||
Details | ,, 57,903 SF - 1 College/University, 3 Stories Above Grade, 50,972 SF New Construction, 1 College/University, 6,931 SF Renovation.
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |