Similar Projects
Last Updated | 01/13/2022 08:55 AM |
Project Title | Architecture Building Renovation/Remodeling and DCP Collaboratory |
Physical Address | View project details and contacts |
City, State (County) | Gainesville, FL 32601 (Alachua County) |
Category(s) | Education |
Sub-Category(s) | College/University |
Contracting Method | Competitive Bids. Construction Management - CM at Risk. |
Project Status | All Submissions Received, Selection Underway |
Bids Due | View project details and contacts |
Estimated Value | $32,000,000 |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The contract for construction management services will consist of three phases, pre-construction, construction and warranty period. Pre-construction services will begin at the Conceptual Schematic Design stage and will include production of cost studies and estimates; value engineering; analysis of the design documents for constructability, coordination, detailing, materials, and systems; development and maintenance of the construction schedule; production of detailed jobsite management plans; development of strategies for the procurement of trade contracts; development of waste management strategies; and development of a Guaranteed Maximum Price (GMP) proposal based on 100% Construction Documents. If the GMP proposal is accepted and executed, the construction phase will be implemented. In this phase, the construction manager becomes the single point of responsibility for performance of the construction of the project and shall publicly bid trade contracts. Failure to negotiate an acceptable fixed fee for phase one of the contract, or failure to arrive at an acceptable GMP budget within the time provided in the agreement, may result in the termination of the construction manager's contract. The construction phase includes a new approximate 50,000 SF facility for the college in the vicinity of the ARCH building to address a multiplicity of space issues. In summary, the project will address the deficiencies of the existing building and create new space to allow for expanded programs, research, and collaboration. |
||||||||||||||||||||||||||||||||||||||
Details | College/University, 56,068 SF Renovation.
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |