Similar Projects
New University House
New Construction
Conception
$11,800,000 est. value
Gainesville, FL

Building 0308 FLMNH - North Florida Water Galley
New Construction
Design
$2,750,000 est. value
Gainesville, FL 32608

Harn Museum American Art Wing
Addition - 20,000 SF
Bidding
$12,700,000 est. value
Gainesville, FL 32608

University of Florida (UF) 644 Inner Road & US 442 Surface Treatment, 644A Inner Road Underground Utilities Improvement, and 644B Reitz Union Lawn Utilities Improvement
Post-Bid
Gainesville, FL 32611

Architecture Building Renovation/Remodeling and DCP Collaboratory
New Construction, Renovation - 56,068 SF
Post-Bid
$32,000,000 est. value
Gainesville, FL 32601

Gator Village aka Honors Residential College
New Construction
Results
$225,000,000 est. value
Gainesville, FL

Continuing Services Contract to Provide Minor Construction Management (CM) Services
Renovation
Results
Less than $200,000 est. value

Blount Center Expansion
Addition - 86,311 SF
Construction
Less than $26,000,000 est. value
Gainesville, FL

The Malachowsky Data Sciences and Information Technology
- 260,000 SF
Construction
Less than $135,000,000 est. value
Gainesville, FL

Engineering Building
New Construction
Post-Bid
$60,000,000 est. value

Public-Private Partnership (P3) to Construct and Operate a Research Facility
New Construction - 30,000 SF
Results
Lakeland, FL 33868

Special Collections Building - Design-Build Services
- 30,000 SF
Construction
Less than $8,000,000 est. value
Gainesville, FL

Racquet Club Dining Renovations (UF Main Campus)
Renovation - 12,000 SF
Post-Bid
Less than $5,800,000 est. value
Gainesville, FL 32611

Construction Managers Performing Arts Complex Phase II
New Construction
Results
$77,000,000 est. value

Student Health Care Center, Phase II
New Construction - 53,000 SF
Construction
$26,000,000 est. value
Gainesville, FL 32611

Last Updated 12/17/2021 12:38 PM
Project Title

Central Energy Plant Project

Physical Address View project details and contacts
City, State (County) Gainesville, FL 32627   (Alachua County)
Category(s) Education, Industrial/Manufacturing
Sub-Category(s) College/University, Heating/Cooling Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Developer’s scope will include the design, construction, financing, operation and maintenance of the Central Energy Plant. The CEP shall be capable of continuously supporting campus operation by delivering 100% of the steam demand required for campus operations, generating electricity efficiently through a combined heat and power (“CHP”) / combined cycle power plant, and producing chilled water to supply cooling to campus buildings, interconnected with other existing University operated chiller plants.

Details

College/University, New Construction.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete, Precast Concrete Specialties.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Protective Covers.
Division 11 - Equipment, Audio-Visual Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Seating, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 42 - Process Heating, Cooling, and Drying Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents