Similar Projects
Reported | 01/07/2022 12:00 AM |
Project Title | Harn Museum American Art Wing |
Physical Address | View project details and contacts |
City, State (County) | Gainesville, FL 32608 (Alachua County) |
Category(s) | Education, Entertainment/Recreation |
Sub-Category(s) | College/University, Museum |
Contracting Method | Competitive Bids. Construction Management - CM at Risk. |
Project Status | Accepting Qualifications |
Bids Due | View project details and contacts |
Estimated Value | $12,700,000 |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The main floor of the new wing will connect to the main floor of the existing building and will extend out towards the parking lot from the Rotunda providing a high level of visibility as visitors approach the entrance of the Harn. The new works on paper study and conservation center would allow scholars and students from around the world to come and study original works of art under the guidance of trained museum staff. The estimated construction budget is approximately $12,700,000, including site improvements, utilities, security, AV and landscape. The project will be delivered using the Construction Manager At-Risk method and the project bid documents will include early site and structure packages. Gold LEED (Leadership in Energy and Environmental Design) certification by the U.S. Green Building Council is mandatory. The contract for construction management services will consist of two phases, pre-construction and construction. Pre-construction services will begin at the Conceptual Schematic Design stage and will include production of cost studies and estimates; value engineering; analysis of the design documents for constructability, coordination, detailing, materials, and systems; development and maintenance of the construction schedule; production of detailed jobsite management plans; development of strategies for the procurement of trade contracts; development of waste management strategies; and development of a Guaranteed Maximum Price (GMP) proposal based on 100% Construction Documents. If the GMP proposal is accepted and executed, the construction phase will be implemented. In this phase, the construction manager becomes the single point of responsibility for performance of the construction of the project and shall publicly bid trade contracts. Failure to negotiate an acceptable fixed fee for phase one of the contract, or failure to arrive at an acceptable GMP budget within the time provided in the agreement, may result in the termination of the construction manager's contract. |
||||||||||||||||||||||||||||||||||||||||
Details | 20,000 SF - Museum, Addition, College/University, Addition.
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |