Similar Projects
New University House
New Construction
Conception
$11,800,000 est. value
Gainesville, FL

Building 0308 FLMNH - North Florida Water Galley
New Construction
Design
$2,750,000 est. value
Gainesville, FL 32608

Gator Village aka Honors Residential College
New Construction
Sub-Bidding
$159,000,000 est. value
Gainesville, FL

University of Florida (UF) 644 Inner Road & US 442 Surface Treatment, 644A Inner Road Underground Utilities Improvement, and 644B Reitz Union Lawn Utilities Improvement
Post-Bid
Gainesville, FL 32611

Architecture Building Renovation/Remodeling and DCP Collaboratory
New Construction, Renovation - 56,068 SF
Post-Bid
$32,000,000 est. value
Gainesville, FL 32601

Continuing Services Contract to Provide Minor Construction Management (CM) Services
Renovation
Results
Less than $200,000 est. value

Public-Private Partnership (P3) to Construct and Operate a Research Facility
New Construction - 30,000 SF
Results
Lakeland, FL 33868

Blount Center Expansion
Addition - 86,311 SF
Construction
Less than $26,000,000 est. value
Gainesville, FL

The Malachowsky Data Sciences and Information Technology
- 260,000 SF
Construction
Less than $135,000,000 est. value
Gainesville, FL

Engineering Building
New Construction
Post-Bid
$60,000,000 est. value

Construction Managers Performing Arts Complex Phase II
New Construction
Results
$77,000,000 est. value

Special Collections Building - Design-Build Services
- 30,000 SF
Construction
Less than $8,000,000 est. value
Gainesville, FL

Racquet Club Dining Renovations (UF Main Campus)
Renovation - 12,000 SF
Post-Bid
Less than $5,800,000 est. value
Gainesville, FL 32611

Central Energy Plant Project
New Construction
Results
Gainesville, FL 32627

Student Health Care Center, Phase II
New Construction - 53,000 SF
Construction
$26,000,000 est. value
Gainesville, FL 32611

Reported 01/07/2022 12:00 AM
Project Title

Harn Museum American Art Wing

Physical Address View project details and contacts
City, State (County) Gainesville, FL 32608   (Alachua County)
Category(s) Education, Entertainment/Recreation
Sub-Category(s) College/University, Museum
Contracting Method Competitive Bids. Construction Management - CM at Risk.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $12,700,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The main floor of the new wing will connect to the main floor of the existing building and will extend out towards the parking lot from the Rotunda providing a high level of visibility as visitors approach the entrance of the Harn. The new works on paper study and conservation center would allow scholars and students from around the world to come and study original works of art under the guidance of trained museum staff. The estimated construction budget is approximately $12,700,000, including site improvements, utilities, security, AV and landscape. The project will be delivered using the Construction Manager At-Risk method and the project bid documents will include early site and structure packages. Gold LEED (Leadership in Energy and Environmental Design) certification by the U.S. Green Building Council is mandatory. The contract for construction management services will consist of two phases, pre-construction and construction. Pre-construction services will begin at the Conceptual Schematic Design stage and will include production of cost studies and estimates; value engineering; analysis of the design documents for constructability, coordination, detailing, materials, and systems; development and maintenance of the construction schedule; production of detailed jobsite management plans; development of strategies for the procurement of trade contracts; development of waste management strategies; and development of a Guaranteed Maximum Price (GMP) proposal based on 100% Construction Documents. If the GMP proposal is accepted and executed, the construction phase will be implemented. In this phase, the construction manager becomes the single point of responsibility for performance of the construction of the project and shall publicly bid trade contracts. Failure to negotiate an acceptable fixed fee for phase one of the contract, or failure to arrive at an acceptable GMP budget within the time provided in the agreement, may result in the termination of the construction manager's contract.

Details

20,000 SF - Museum, Addition, College/University, Addition.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Specialty Doors and Frames, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Visual Display Units, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Loading Dock Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Site Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents