Similar Projects
Summit Street Water Storage Tank Painting - WS.28 - City of Brighton
Infrastructure
Conception
$775,000 CJ est. value
Brighton, MI 48116

Main Street Streetscape - City of Brighton
Infrastructure
Conception
$4,573,700 CJ est. value
Brighton, MI 48116

St Joseph Mercy - Brighton Expansion & Renovations / Trinity Health
New Construction, Renovation, Infrastructure - 209,326 SF
Design
$100,000,000 CJ est. value
Brighton, MI 48114

Main Street Water Main
Infrastructure
Bidding
$600,000 CJ est. value
Brighton, MI 48116

South Rickett Road - Road and Utility Improvements CSX Railroad to City Limit
Post-Bid
$1,291,000 est. value
Brighton, MI 48116

Bundle 3 Rest Areas Ada Eastern Lower Peninsula - Exterior
Post-Bid

City Hall Campus Parking Lot Replacement Project
Results
Less than $298,362 est. value
Farmington Hills, MI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Pella-Dar Townhomes
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Royal Oak, MI 48067

Pella-Dar Townhomes
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Royal Oak, MI 48067

Rehabilitation of Pine Creek Lift Stations - City of Brighton
Infrastructure
Conception
$517,000 CJ est. value
Brighton, MI 48116

Crack Filling - Parking Lots
Post-Bid
Brighton, MI

Gallagher Road Trail
Results
Rochester, MI 48306

The Delaware
New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Royal Oak, MI 48067

Removal of Thin Epoxy Overlay
Infrastructure
Post-Bid

Last Updated 09/15/2022 05:01 PM
Project Title

CDBG ADA Sidewalk and Ramp Installation Project

Physical Address View project details and contacts
City, State (County) Milford, MI 48381   (Oakland County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Village of Milford, Milford, MI will receive sealed bids for the removal and reinstallation of sidewalks at designated intersections in the public right-of-way. The goal of the project is that the reinstallation of the walks, landings, detectable warnings and ramps will create compliance with current standards found in the Public Rights-of-Way Accessibility Guidelines (PROWAG). This is a Federally Funded Project. The Contractor and Subcontractors on this project must comply with HUD contract provisions 24 CFR part 85.36(i), the Davis-Bacon Act. Nondiscrimination, Equal Employment Opportunity, Affirmative Action, Section 3 requirements, Anti-Kickback Act, Federal Occupational Safety and Health Act and Department of Labor Standards and Regulations as set forth in the Contract Bid Documents. Bids will be awarded to the lowest responsible bidder. This municipality is an equal opportunity employer, businesses owned by women or minorities are strongly encouraged to bid. Exceptions to the specifications must be clearly identified and explained. Prices are to be inclusive of taxes and other charges. The Village of Milford reserves the right to reject any and all Bids. Deborah S. Frazer, CMMC Assistant Manager/Clerk

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents