Similar Projects
Summit Street Water Storage Tank Painting - WS.28 - City of Brighton
Infrastructure
Conception
$775,000 CJ est. value
Brighton, MI 48116

Main Street Streetscape - City of Brighton
Infrastructure
Conception
$4,573,700 CJ est. value
Brighton, MI 48116

St Joseph Mercy - Brighton Expansion & Renovations / Trinity Health
New Construction, Renovation, Infrastructure - 209,326 SF
Design
$100,000,000 CJ est. value
Brighton, MI 48114

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

CDBG ADA Sidewalk and Ramp Installation Project
Infrastructure
Post-Bid
$800,000 CJ est. value
Milford, MI 48381

Huron Street Reconstruction and Water Main Improvements
Results
Less than $1,050,000 est. value
Milford, MI

East Grand River Water Main Improvements
Infrastructure
Results
Howell, MI 48855

Howell Storage Marion D19 Expansion and Renovation
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Howell, MI 48843

Rehabilitation of Pine Creek Lift Stations - City of Brighton
Infrastructure
Conception
$517,000 CJ est. value
Brighton, MI 48116

Three-Way Valve
Infrastructure
Post-Bid
MI

Interior Steam Renovations and Site Improvements
Renovation, Infrastructure
Results
Brighton, MI 48116

Pathfinder School Navigator School - Site Improvements (2022)
Infrastructure
Post-Bid
Pinckney, MI 48169

Riddle Street Water Main Replacement
Alteration
Results
Howell, MI

East Grand River Sidewalk
Infrastructure
Post-Bid
$200,000 CJ est. value
Brighton, MI 48116

Water System Infrastructure Repairs / Woodland Center Correctional Facility
Infrastructure
Results
Whitmore Lake, MI 48189

Last Updated 09/12/2022 12:05 PM
Project Title

Main Street Water Main

Physical Address View project details and contacts
City, State (County) Brighton, MI 48116   (Livingston County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Brighton, Michigan desires to employ the services of a contractor, or contractors, to install a new water main, and appurtenances, on Main Street between the CSX railroad crossing and Grand River Avenue and retire the existing water main in place. Additionally, new water main is to be installed in the public alley paralleling Grand River Avenue, south of E. Main Street. This work is to take place under winter conditions. General Requirements - Bid Deposit Required - Contractors License Required - Insurance Required Bonding Requirements - Bid Bond 5 % Job Location Brighton, MI Question Acceptance Deadline 09/07/2022 02:00 PM EDT Questions are submitted online Yes

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents