Similar Projects
Summit Street Water Storage Tank Painting - WS.28 - City of Brighton
Infrastructure
Conception
$775,000 CJ est. value
Brighton, MI 48116

Rehabilitation of Pine Creek Lift Stations - City of Brighton
Infrastructure
Conception
$517,000 CJ est. value
Brighton, MI 48116

Catholic Healthcare International Church / Padre Pio
New Construction, Infrastructure - 6,090 SF
Design
$1,200,000 CJ est. value
Howell, MI 48843

St Joseph Mercy - Brighton Expansion & Renovations / Trinity Health
New Construction, Renovation, Infrastructure - 209,326 SF
Design
$238,200,000 CJ est. value
Brighton, MI 48114

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Main Street Streetscape
Infrastructure
Bidding
$4,573,700 CJ est. value
Brighton, MI 48116

Fowlerville Community Schools New K-2 Building Project
New Construction, Infrastructure
Sub-Bidding
$2,500,000 CJ est. value
Fowlerville, MI 48836

CDBG ADA Sidewalk and Ramp Installation Project
Infrastructure
Post-Bid
$800,000 CJ est. value
Milford, MI 48381

Three-Way Valve
Infrastructure
Post-Bid
MI

East Grand River Water Main Improvements
Infrastructure
Results
$2,599,147 CJ est. value
Howell, MI 48843

East Grand River Water Main Improvements
Infrastructure
Results
$2,599,147 CJ est. value
Howell, MI 48843

U-M Health Brighton Center for Specialty Care Linear Accelerator Expansion
Addition, Infrastructure - 2,200 SF
Construction
$750,000 CJ est. value
Brighton, MI 48116

Howell Storage Marion D19 Expansion and Renovation
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Howell, MI 48843

Brighton Cove Apartments Sanitary Pump Station Replacement
Infrastructure
Pending Verification
$200,000 CJ est. value
Brighton, MI 48116

AutoZone #5732 / Fowlerville
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Fowlerville, MI 48836

Last Updated 12/30/2022 11:40 AM
Project Title

Riddle Street Water Main Replacement

Physical Address View project details and contacts
City, State (County) Howell, MI 48843   (Livingston County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $479,255 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 30, 2022, the project has not been awarded. A timeline for award has not been confirmed. Question Acceptance Deadline 02/23/2022 05:00 PM EST Questions are submitted online No Install approx. 904 Ft of H.D.P.E. and Ductile Iron Water Main along Riddle Street utilizing open cut, horizontal directional drill, and jack and bore methods. General Requirements - Bid Deposit Required - Insurance Required - Installation Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 100 % - Payment Bond 100 %

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents