Similar Projects
Southwood Community Center Parking Lot Renovation
Infrastructure
Bidding
$727,000 est. value
Orlando, FL 32809

SheltAir FBO Parking Lot Expansion
Addition
Post-Bid
Orlando, FL 32803

Sidewalk Concrete Repairs and Construction
Term Contract
Results
$1,000,000 est. value
Orlando, FL 32802

Bike Path/Trail/Drainage Improvements (BDI)
Results
Less than $234,109 est. value
FL

Airport Gap Trail
Results
Less than $500,036 est. value
Orlando, FL 32802

Concrete Curbs and Sidewalks
Results
Orlando, FL 32801

East 5th Street Public Parking Construction
Results
Apopka, FL 32703

Road Improvements for Remington Community Development District
Results
$745,000 est. value
Orlando, FL 32801

Orange County Infrastructure Repair and Replacement
Term Contract
Results
Orlando, FL

Repave And Restripe The Gardenia Parking Lot
Results
Orlando, FL 32839

Roadbase, Asphalt, Curb, Gutter and Miscellaneous Concrete Repairs
Term Contract
Results
Less than $3,933,175 est. value
Orlando, FL 32801

Tosohatchee (Viewing Platform at MUD Canal)
Results
Less than $202,000 est. value
Christmas, FL 32709

Orlando Urban Trail Gap and Extension Project
Results
Less than $3,622,289 est. value
Orlando, FL 32802

Mercy and WD Judge Drive Crosswalks
Results
Less than $285,595 est. value
Orlando, FL 32808

Lighting
Results
Less than $141,736 est. value
FL

Last Updated 06/08/2021 05:18 AM
Project Title

Shingle Creek Regional Trail Phase 1 Segment 3 (from Taft-Vineland Road at Central Florida Parkway to State Road 528)

Physical Address View project details and contacts
City, State (County) Orlando, FL 32813   (Orange County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,434,791
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the construction of a multi-use trail up to 14- ft wide (typ) between Central Florida Parkway and SR 528, for a total distance of 0.931 miles. The project includes the construction of approximately 2,598 feet of boardwalk, 1,875 feet of asphalt trail, and 175 feet of 6-inch thick concrete trail, ribbon concrete curb, pedestrian/bicycle picket railing, Type B fencing, signing, plastic erosion mat, and performance turf (sod) installation. Site preparation work includes erosion control, clearing and grubbing, guardrail removal, tree removal, excavation, and embankment. All pedestrian features are to adhere to current ADA standards. Utility coordination is required. Orange County shall construct the project within the limits of the existing right of way and trail easements.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents