Similar Projects
Last Updated | 01/04/2021 03:52 PM |
Project Title | Orlando Urban Trail Gap and Extension Project |
Physical Address | View project details and contacts |
City, State (County) | Orlando, FL 32802 (Orange County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $3,622,289 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Orlando Urban Trail Gap & Extension connectivity project consists of the construction of two portions of trail that will be referred to as the NORTH trail and the SOUTH trail. The NORTH trail will consist of the design of a 10ft width concrete multi-use trail and 6ft sidewalk for a total approximate length of 0.4 miles. The project will begin at the end of the existing trail from the Colonial Drive Overpass bridge and travel North along Orange Ave to Weber Street. The trail will be located on the West side of Orange Ave. to Marks Street and will then transition to the East side of Orange Ave. It will then continue along Weber St., on the North side, and will terminate at to the existing western terminus of the Dinky Line portion of the Orlando Urban Trail at Magnolia Ave. This NORTH trail also includes the installation of a new signalized intersection at the intersection of Weber Street and Magnolia Avenue. The SOUTH trail will include the design of a 10ft width concrete multi-use trail to fill in gaps in the Orlando Urban Trail within Downtown Orlando for a total approximate length of 2 miles. The trail will begin at Michigan St. and Division Ave. and will continue North along Division St. to just South of Gore St. This South Trail also includes a trail spur on Columbia Street from Division Avenue to west of Atlanta Avenue.The Orlando Urban Trail Gap & Extension connectivity project consists of the construction of two portions of trail that will be referred to as the NORTH trail and the SOUTH trail. The NORTH trail will consist of the design of a 10ft width concrete multi-use trail and 6ft sidewalk for a total approximate length of 0.4 miles. The project will begin at the end of the existing trail from the Colonial Drive Overpass bridge and travel North along Orange Ave to Weber Street. The trail will be located on the West side of Orange Ave. to Marks Street and will then transition to the East side of Orange Ave. It will then continue along Weber St., on the North side, and will terminate at to the existing western terminus of the Dinky Line portion of the Orlando Urban Trail at Magnolia Ave. This NORTH trail also includes the installation of a new signalized intersection at the intersection of Weber Street and Magnolia Avenue. The SOUTH trail will include the design of a 10ft width concrete multi-use trail to fill in gaps in the Orlando Urban Trail within Downtown Orlando for a total approximate length of 2 miles. The trail will begin at Michigan St. and Division Ave. and will continue North along Division St. to just South of Gore St. This South Trail also includes a trail spur on Columbia Street from Division Avenue to west of Atlanta Avenue. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |