Similar Projects
Construction Services for the Sidewalk Safety Improvement Program
Term Contract
Bidding
$3,470,725 est. value
FL

Shingle Creek Regional Trail Phase 1 Segment 3 (from Taft-Vineland Road at Central Florida Parkway to State Road 528)
Bidding
$4,434,791 est. value
Orlando, FL 32813

Mercy and WD Judge Drive Crosswalks
Post-Bid
Less than $285,595 est. value
Orlando, FL 32808

SheltAir FBO Parking Lot Expansion
Addition
Post-Bid
Orlando, FL 32803

Orange County Michigan Campus Parking Improvements
Results
Less than $1,175,000 est. value
Orlando, FL 32806

Sidewalk Concrete Repairs and Construction
Term Contract
Results
$1,000,000 est. value
Orlando, FL 32802

AutoNation Vehicle Storage Lot - Parking Area Upgrades
Construction
$750,000 est. value
Orlando, FL 32807

Bike Path/Trail/Drainage Improvements (BDI)
Results
Less than $234,109 est. value
FL

Airport Gap Trail
Results
Less than $500,036 est. value
Orlando, FL 32802

Concrete Curbs and Sidewalks
Results
Orlando, FL 32801

East 5th Street Public Parking Construction
Results
Apopka, FL 32703

Road Improvements for Remington Community Development District
Results
$745,000 est. value
Orlando, FL 32801

Orange County Infrastructure Repair and Replacement
Term Contract
Results
Orlando, FL

Repave And Restripe The Gardenia Parking Lot
Results
Orlando, FL 32839

Roadbase, Asphalt, Curb, Gutter and Miscellaneous Concrete Repairs
Term Contract
Results
Less than $3,933,175 est. value
Orlando, FL 32801

Last Updated 01/04/2021 03:52 PM
Project Title

Orlando Urban Trail Gap and Extension Project

Physical Address View project details and contacts
City, State (County) Orlando, FL 32802   (Orange County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,622,289
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Orlando Urban Trail Gap & Extension connectivity project consists of the construction of two portions of trail that will be referred to as the NORTH trail and the SOUTH trail. The NORTH trail will consist of the design of a 10ft width concrete multi-use trail and 6ft sidewalk for a total approximate length of 0.4 miles. The project will begin at the end of the existing trail from the Colonial Drive Overpass bridge and travel North along Orange Ave to Weber Street. The trail will be located on the West side of Orange Ave. to Marks Street and will then transition to the East side of Orange Ave. It will then continue along Weber St., on the North side, and will terminate at to the existing western terminus of the Dinky Line portion of the Orlando Urban Trail at Magnolia Ave. This NORTH trail also includes the installation of a new signalized intersection at the intersection of Weber Street and Magnolia Avenue. The SOUTH trail will include the design of a 10ft width concrete multi-use trail to fill in gaps in the Orlando Urban Trail within Downtown Orlando for a total approximate length of 2 miles. The trail will begin at Michigan St. and Division Ave. and will continue North along Division St. to just South of Gore St. This South Trail also includes a trail spur on Columbia Street from Division Avenue to west of Atlanta Avenue.The Orlando Urban Trail Gap & Extension connectivity project consists of the construction of two portions of trail that will be referred to as the NORTH trail and the SOUTH trail. The NORTH trail will consist of the design of a 10ft width concrete multi-use trail and 6ft sidewalk for a total approximate length of 0.4 miles. The project will begin at the end of the existing trail from the Colonial Drive Overpass bridge and travel North along Orange Ave to Weber Street. The trail will be located on the West side of Orange Ave. to Marks Street and will then transition to the East side of Orange Ave. It will then continue along Weber St., on the North side, and will terminate at to the existing western terminus of the Dinky Line portion of the Orlando Urban Trail at Magnolia Ave. This NORTH trail also includes the installation of a new signalized intersection at the intersection of Weber Street and Magnolia Avenue. The SOUTH trail will include the design of a 10ft width concrete multi-use trail to fill in gaps in the Orlando Urban Trail within Downtown Orlando for a total approximate length of 2 miles. The trail will begin at Michigan St. and Division Ave. and will continue North along Division St. to just South of Gore St. This South Trail also includes a trail spur on Columbia Street from Division Avenue to west of Atlanta Avenue.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents