Similar Projects
Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Design
Less than $75,000,000 est. value
Washington, DC

Benning Road Reconstruction & Streetcar
Infrastructure
Design
Washington, DC 20019

Reconstruction of Florida Avenue, and 9th Street, NW from T Street to Barry Place, NW
Post-Bid
Washington, DC 20009

Southern Avenue from Barnaby Road, South East to UMC Campus
Post-Bid
Washington, DC 20009

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Redevelopment of St. Elizabeths East Campus - Pecan Street Infrastructure Improvements
Results
Washington, DC 20032

Wheeler Road Mulitmodal Safety & Access
Infrastructure
Pending Verification
Washington, DC 20032

East Capitol Street Safety & Mobility
Infrastructure
Pending Verification
DC

15th Street Protected Bike Lane
Infrastructure
Design
Washington, DC 20544

Rehabilitation of 16th Street, NW Bridge Over Piney Branch Parkway (Bridge No. 0022)
Post-Bid
Washington, DC 20260

Martin Luther King Jr Avenue SE Phase II
Infrastructure
Pending Verification
Washington, DC 20544

Beech Grove Maintenance Yard Paving Improvements
Term Contract
Post-Bid
Washington, DC

Federal Aid Pavement Restoration National Highway Performance Program (NHHP) Streets
Term Contract, Infrastructure
Post-Bid
Washington, DC

Asphalt and Cement Services
Infrastructure
Post-Bid
Washington, DC

Redevelopment of St. Elizabeths East Campus-13th Street SE Infrastructure Improvements
Infrastructure
Post-Bid
Washington, DC 20032

Last Updated 01/28/2022 12:02 PM
Project Title

Aspen Street Northwest Rehabilitation

Physical Address View project details and contacts
City, State (County) Washington, DC 20544   (District of Columbia County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Design Development, Bidding Expected second quarter 2022, Construction Start Expected third quarter 2022, Construction Completion Expected third quarter 2024
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work for rehabilitation of Aspen Street NW includes right of way widening from 55 feet to 75 feet and roadway widening from 34 feet to 38 feet; Construction of 10-foot wide multi-use trail on North side and improved sidewalk on South Side. It also includes street lights/traffic lights upgrades and a proposal for additional dedicated turning lanes at the intersection of Aspen Ave NW & 16th Street NW and Aspen Ave NW & Georgia Avenue NW. The scope is provided to improve drainage conditions, storm water management, green infrastructure and landscaping throughout the project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents