Similar Projects
Last Updated | 10/11/2022 01:35 PM |
Project Title | Monroe County Physical Education Training Center |
Physical Address | View project details and contacts |
City, State (County) | Tompkinsville, KY 42167 (Monroe County) |
Category(s) | Entertainment/Recreation, Heavy and Highway |
Sub-Category(s) | Athletic Facility, Site Development |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected March 2022 |
Bids Due | View project details and contacts |
Estimated Value | $5,208,598 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The following bids are requested: Bid Package 010 Site Excavation and Exterior Utilities Bid Package 020 Paving Bid Package 030 General Trades and Concrete Bid Package 096 Flooring Bid Package 210 Fire Protection Bid Package 220 Plumbing and HVAC Bid Package 260 Electrical Plans and specifications may be examined at the following locations: Owner: Monroe County Board of Education, 309 Emberton St, Tompkinsville, KY 42167,Architect: Ross Tarrant Architects, 101 Lafayette Ave, Lexington, KY 40502, Engineers: CMTA, 2429 Members Way, Lexington, KY 40504 Construction Manager, Alliance Corporation, 116 E. College Street, Glasgow, KY 42141 There are major material items within the various bid packages, which will be bid through the respective Contractor but purchased direct by the Owner. Interested material suppliers should contact the Construction Manager (Alliance Corporation) for the names of contractors who have expressed an interest in the bid packages involved. All bids shall be submitted only on the form of proposal and in the envelope prepared by the Construction Manager. The proposal envelope will have the project and respective bid package(s) number affixed. Alliance Corporation is the Construction Manager for this project, acting as agent for the Owner and acting in the Owner's behalf in soliciting your proposal. Each successful bidder shall execute a contract directly with the Owner and not with the Construction Manager. Each proposal shall be accompanied by a certified check, cash or bidders bond, executed by the bidder and Surety Company, IN THE SUM OF NOT LESS THAN FIVE PERCENT (5%) OF THE AMOUNT OF THE BASE PROPOSAL. The bid security is required as a guarantee that if the proposal is accepted a contract will be immediately entered into and the performance of it properly secured. Proposal forms must be properly filled out. No qualifying letters or statements will be considered. No bidder may withdraw a bid submitted for a period of sixty (60) days after the date set for the opening of bids. In the event the bidder to whom the contract is awarded fails to execute a satisfactory contract and bond, he shall be eliminated and shall forfeit his certified check, cash or bid bond and shall be liable for the loss occasioned by the Owner by such failure. There are major material items within the various bid packages, which will be bid through the respective Contractor but purchased direct by the Owner. Interested material suppliers should contact the Construction Manager (Alliance Corporation) for the names of contractors who have expressed an interest in the bid packages involved. This project is federally funded therefore, prevailing wage rates do apply. See section 018999-Prevailing Wage Rates for more information. PN - 2119/XMAF21 Bid Result 010 Site Excavation & Exterior Utilities -CRS Construction -$257,617 020 Paving - Scotty's Contracting - $114,600 030 General Trades & Concrete- Alliance Corporation - $2,792,000 096 Flooring - CDI Flooring - $216,362 210 Fire Protection - Premier Fire & Security-Owensboro - $188,950 220 Plumbing & HVAC - Green Mechanical - $770,400 260 Electrical - D & M Electric -$868,669 |
||||||||||||||||||||||||||||||||||||||||||||||
Details | Middle/Senior High School, Renovation, Athletic Facility, Renovation.
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |