Similar Projects
Dever Golf Cart Sales and Service Center
New Construction, Infrastructure - 16,630 SF
Conception
$2,500,000 CJ est. value
Louisville, KY 40245

Widen I-71 From Four to Six Lanes From KY-393
Infrastructure
Conception
$40,000,000 CJ est. value
Crestwood, KY 40014

Corbin High School Multi-Purpose Athletic Buildings
New Construction, Infrastructure - 9,585 SF
Design
$2,000,000 CJ est. value
Corbin, KY 40701

Corbin High School Multi-Purpose Athletic Buildings
New Construction, Infrastructure - 9,585 SF
Design
$2,000,000 CJ est. value
Corbin, KY 40701

Asphalt Pavement & Roadway Rehab
Infrastructure
Bidding
$3,435,860 CJ est. value
Hopkinsville, KY 42240

Salyersville Water Intake Pump Replacement
Infrastructure
Bidding
$300,000 CJ est. value
Salyersville, KY 41465

Rotary Drilling
Term Contract, Infrastructure
Post-Bid
Covington, KY

Architectural and Construction Management Services for Indoor Multipurpose Gymnasium
New Construction
Post-Bid
KY

Meadows-Northland-Arlington Neighborhood Improvement Phase 6B-1 and 6B-2
Results
Lexington, KY

National Responders Preparedness Center (NRPC) Expansion
Infrastructure
Results
$6,115,705 est. value
Greenville, KY 42345

TopGolf
New Construction - 52,997 SF
Construction
$22,573,200 est. value
Louisville, KY 40222

Murray-Calloway County Hospital Re-Roofing
Renovation
Construction
Murray, KY 42071

Home Emporium/Louisville
New Construction, Infrastructure - 25,000 SF
Pending Verification
$6,000,000 CJ est. value
Louisville, KY 40299

Beaumont Middle School - Fayette County Board of Education
Renovation, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Lexington, KY 40504

Address Pavement Condition
Infrastructure
Conception
$3,250,000 CJ est. value
Elizabethtown, KY 42701

Last Updated 10/11/2022 01:35 PM
Project Title

Monroe County Physical Education Training Center

Physical Address View project details and contacts
City, State (County) Tompkinsville, KY 42167   (Monroe County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2022
Bids Due View project details and contacts
Estimated Value $5,208,598 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The following bids are requested: Bid Package 010 Site Excavation and Exterior Utilities Bid Package 020 Paving Bid Package 030 General Trades and Concrete Bid Package 096 Flooring Bid Package 210 Fire Protection Bid Package 220 Plumbing and HVAC Bid Package 260 Electrical Plans and specifications may be examined at the following locations: Owner: Monroe County Board of Education, 309 Emberton St, Tompkinsville, KY 42167,Architect: Ross Tarrant Architects, 101 Lafayette Ave, Lexington, KY 40502, Engineers: CMTA, 2429 Members Way, Lexington, KY 40504 Construction Manager, Alliance Corporation, 116 E. College Street, Glasgow, KY 42141 There are major material items within the various bid packages, which will be bid through the respective Contractor but purchased direct by the Owner. Interested material suppliers should contact the Construction Manager (Alliance Corporation) for the names of contractors who have expressed an interest in the bid packages involved. All bids shall be submitted only on the form of proposal and in the envelope prepared by the Construction Manager. The proposal envelope will have the project and respective bid package(s) number affixed. Alliance Corporation is the Construction Manager for this project, acting as agent for the Owner and acting in the Owner's behalf in soliciting your proposal. Each successful bidder shall execute a contract directly with the Owner and not with the Construction Manager. Each proposal shall be accompanied by a certified check, cash or bidders bond, executed by the bidder and Surety Company, IN THE SUM OF NOT LESS THAN FIVE PERCENT (5%) OF THE AMOUNT OF THE BASE PROPOSAL. The bid security is required as a guarantee that if the proposal is accepted a contract will be immediately entered into and the performance of it properly secured. Proposal forms must be properly filled out. No qualifying letters or statements will be considered. No bidder may withdraw a bid submitted for a period of sixty (60) days after the date set for the opening of bids. In the event the bidder to whom the contract is awarded fails to execute a satisfactory contract and bond, he shall be eliminated and shall forfeit his certified check, cash or bid bond and shall be liable for the loss occasioned by the Owner by such failure. There are major material items within the various bid packages, which will be bid through the respective Contractor but purchased direct by the Owner. Interested material suppliers should contact the Construction Manager (Alliance Corporation) for the names of contractors who have expressed an interest in the bid packages involved. This project is federally funded therefore, prevailing wage rates do apply. See section 018999-Prevailing Wage Rates for more information. PN - 2119/XMAF21 Bid Result 010 Site Excavation & Exterior Utilities -CRS Construction -$257,617 020 Paving - Scotty's Contracting - $114,600 030 General Trades & Concrete- Alliance Corporation - $2,792,000 096 Flooring - CDI Flooring - $216,362 210 Fire Protection - Premier Fire & Security-Owensboro - $188,950 220 Plumbing & HVAC - Green Mechanical - $770,400 260 Electrical - D & M Electric -$868,669

Details

Middle/Senior High School, Renovation, Athletic Facility, Renovation.
Division 01 - General Requirements, Construction Facilities.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating, Painting.
Division 10 - Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Lighting.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents