Similar Projects
RFQ Design - University of Texas Health RGV Ambulatory Surgical Center and Cancer Center
New Construction, Infrastructure - 96,420 SF
Conception
$49,481,200 CJ est. value
Edinburg, TX 78539

RFQ Design - Downtown Parking and Retail Facility
Infrastructure, Renovation
Conception
$900,000 CJ est. value
Edinburg, TX 78541

La Joya ISD Esser Funds - Canopy Structures Phase 3
Infrastructure
Design
$98,000 CJ est. value
La Joya, TX 78560

Republic Finance-Mission Build-Out
Renovation - 1,786 SF
Design
$123,000 est. value
Mission, TX 78573

7 Brew Coffee / Pharr
New Construction, Infrastructure - 510 SF
Bidding
$600,000 CJ est. value
Pharr, TX 78577

2021 Alamo Water and Sewer Improvements
Infrastructure
Bidding
$300,000 CJ est. value
Edinburg, TX 78539

Aqualina at Tres Lagos Phase 1 Subdivision - Utility and Paving Improvements
Post-Bid
McAllen, TX 78504

Southeastern Freight Lines
Renovation
Post-Bid
Weslaco, TX 78596

Renovation, Warehouse and Signal Shop, Pharr DHQ
Renovation
Results
$2,941,380 est. value
Pharr, TX 78577

McAllen Public Works Storage Building Addition Unit "F"
Addition
Results
Less than $95,000 est. value
McAllen, TX 78504

Weslaco Shell Building - Phase I
New Construction - 9,697 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Weslaco, TX 78596

McAllen New Parks Facility and Metro Transfer Station
New Construction - 7,100 SF
Construction
Less than $8,000,000 est. value
McAllen, TX

Dutch Bros Coffee / Mission
New Construction, Infrastructure - 950 SF
Pending Verification
$350,000 CJ est. value
Mission, TX 78572

Only Love Prescribed Pediatric Extended Care Center
New Construction, Infrastructure - 7,582 SF
Pending Verification
$1,000,000 CJ est. value
McAllen, TX 78504

New Parking Lot and Office Building
New Construction - 1,818 SF
Design
$350,000 est. value
McAllen, TX 78503

Last Updated 08/26/2022 01:02 PM
Project Title

Super Starr Produce Warehouse

Physical Address View project details and contacts
City, State (County) San Juan, TX 78589   (Hidalgo County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Office, Site Development, Warehouse/Storage
Contracting Method Bids by Invitation
Project Status Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $9,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: New construction of a warehouse and offices As of August 26, 2022, this project is on hold. A firm construction timeline is unknown.

Details

Office, New Construction, Industrial Warehouse, 67,514 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents