Similar Projects
LED Traffic Signals
Bidding

Paving and Surface Treatment
Bidding
West Grove, PA

Great Valley Middle School Site Paving & Wall Restoration Phase 2
Post-Bid
$950,000 est. value
Malvern, PA 19355

Misc. Traffic Control Devices
Term Contract
Post-Bid

Advanced Traffic Management System
Term Contract
Results
$4,872,319 est. value

Traffic Signal Services
Term Contract
Results
Phoenixville, PA 19460

2021 Roadway Paving Program
Bidding
$270,000 est. value
Exton, PA

Road Improvements 2020
Post-Bid
Elverson, PA 19520

Roadway and Miscellaneous Repairs Between Milepost 299.98 and Milepost 356.42, Between Milepost H-40.83 and Milepost H-43.44 and Between Milepost A-20.00 and Milepost A-31.34
Term Contract
Results

2021 Liquid Fuels Fund Paving
Bidding
$230,000 est. value
Devon, PA

Chip Seal of Township Roads
Post-Bid
Chester Springs, PA 19425

Route 100 Multi-Modal Trail Exton Train Station to Chester Valley Trail and Signal Upgrades and Crossing Improvements
Results
Less than $1,200,000 est. value
Exton, PA 19341

2021 Street Improvements
Bidding
$440,000 est. value
PA

Asphalt Resurfacing
Post-Bid
PA

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Last Updated 05/13/2021 05:26 PM
Project Title

Boot Road Corridor Improvements

Physical Address View project details and contacts
City, State (County) West Chester, PA 19380   (Chester County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of work along Boot Road in West Goshen Township, Chester County, PA from the Greenhill Road intersection to the Carriage Drive intersection. Work consists of milling/paving, signing and pavement marking, and signal upgrades (timings) at the Boot Road/Greenhill Road and Boot Road/Wilson Drive intersections. Timing upgrades are also being implemented to the signal coordination system that includes the two traffic signals at the SR 202 interchange.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents