Similar Projects
DFCM Construction-Stage II VBS Commissioning-USCF GMPs 03.01/03.02/06.01/08.01/08.01.1 -15310100
Post-Bid
Less than $45,000,000 est. value
Salt Lake City, UT 84114

DFCM Construction - USU Mountain View Residence Hall Commissioning Services - 20067770
Post-Bid
Salt Lake City, UT 84114

DFCM Construction - Commissioning Services - SLCC Herriman Campus Juniper Building
Results
Salt Lake City, UT 84129

Public Safety Building - Commissioning Agent
Results
$98,000,000 est. value
Salt Lake City, UT 84102

Systems Commissioning
Term Contract
Results
Ogden, UT 84401

Sorensen Student Center Remodel/Addition
Results
Less than $19,500,000 est. value
Orem, UT

Salt Lake Airport Decommissioning, Rigging, and Shipping Services
Post-Bid
Salt Lake City, UT 84114

DFCM Construction - UU MEDX Commissioning
Results
Salt Lake City, UT

DFCM Construction - Commissioning DSU Campus View Suites Phase II - 20393640
Results
Less than $32,000,000 est. value
Saint George, UT

DFCM Construction-Stage II VBS Commissioning - USCF GMPS 07.01 and 07.03-15310100
Post-Bid
$105,000,000 est. value
Salt Lake City, UT 84114

DFCM Construction - University of Utah MEDX Building Envelope Commissioning Services
Results
Salt Lake City, UT 84112

Last Updated 01/11/2021 02:06 PM
Project Title

Dfcm Construction-Das Surplus/Fleet/Dfcm Facilities Relocation

Physical Address View project details and contacts
City, State (County) West Valley City, UT   (Salt Lake County)
Category(s) Professional Services
Sub-Category(s) Commissioning
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $23,183,493
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: The initial contract will be for programming services for the relocation of State Surplus, Fleet Services, and DFCM Facilities from the Utah State Prison Point of the Mountain Draper site to approximately 11.7 acres in West Valley City, Utah at approximately 4600 South 2700 West. After satisfactory completion of the programming, DFCM may award design services to the programming consultant if the project is funded in the Spring 2021 Legislative session. Construction Budget: $23,183,493 which includes new building costs, total site development (valued at $5.54 million of the budget), high performance building needs, and interior and exterior signage. Not included in the construction cost are pre-design costs, programming costs, architectural design costs, FF&E costs or F&E design, utility connections, utility impact fees, and state-provided rack-mounted IT equipment for tele-data service. The maximum programming fee will be $205,000.00. The maximum design fee will be $1,242,635.00.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents