Similar Projects
Comprehensive Infrastructure for Tampa’s Neighborhoods - Design-Build
Design
Less than $4,362,009 est. value
Tampa, FL 33602

I-75 Big Bend Road
Bidding
FL

I-75 MLK DDI
Bidding
FL

Forest Brooke Subdivision, Phase 3C and Collector Road 2nd Extension, Phase 1
Post-Bid
Wimauma, FL

CDBG Project for Streets Resurfacing
Post-Bid
Plant City, FL

North Franklin and West English Streets Improvements
Results
Plant City, FL 33564

Prequalification in Hot Plant-Mixed Bituminous Courses Required
Results
Less than $264,727 est. value
FL

General Asphalt Resurfacing
Term Contract
Bidding
Temple Terrace, FL

Turkey Creek Road Project
Post-Bid
$3,000,000 est. value
Plant City, FL 33566

Inspection, Management and Performance of I-4, I-275, I-75, I-375, and I-4 Connector in Hillsborough and Pinellas Counties
Results
Less than $39,856,572 est. value

East Selmon Expressway Slip Ramps Design-Build
Bidding
Tampa, FL

Villages N and P Infrastructure Construction Project
Post-Bid
Tampa, FL

Asphalt Milling Services
Results
Less than $475,000 est. value
Tampa, FL 33601

Roadway Restoration - Water Department
Term Contract
Bidding
$650,000 est. value
Tampa, FL

Construction, Orient Road and Sligh Avenue Intersection Improvements
Post-Bid
Less than $1,144,777 est. value
Tampa, FL 33600

Reported 01/30/2021 12:00 AM
Project Title

US 301 Bloomingdale

Physical Address View project details and contacts
City, State (County) FL   (Hillsborough County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Design-Build. Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of roadway improvements to US 301/SR 43 from north of Lake St. Charles Blvd to north of Progress Blvd and US 301/SR 676A from south of Bloomingdale Ave. to Bloomingdale Ave. and I-75 northbound on ramp from northbound US 301 to I-75 northbound in Hillsborough County. These improvements include new concrete pavement, rehabilitation of existing concrete pavement, milling and resurfacing of existing asphalt, paving, signing and pavement markings, lighting, signalization, utility coordination, permitting, drainage structures, sidewalk, walls, earthwork, grading, sodding, maintenance of traffic and other services, materials and activities necessary to complete the project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents