Similar Projects
Comprehensive Infrastructure for Tampa's Neighborhoods - Design-Build
Design
Less than $4,362,009 est. value
Tampa, FL 33602

East Selmon Expressway Slip Ramps Design-Build
Design
Tampa, FL

US 301 Bloomingdale
Post-Bid
FL

Forest Brooke Subdivision, Phase 3C and Collector Road 2nd Extension, Phase 1
Post-Bid
Wimauma, FL

Inspection, Management and Performance of I-4, I-275, I-75, I-375, and I-4 Connector in Hillsborough and Pinellas Counties
Results
Less than $39,856,572 est. value

Ground Subsidence Repair
Results
$500,000 est. value
FL

I-75 MLK DDI
Post-Bid
FL

Add Auxiliary Lane(S) Prequalification Required
Results
Less than $2,510,000 est. value
FL

CDBG Project for Streets Resurfacing
Post-Bid
Plant City, FL

Asphalt Pavement Widening/ Drainage Improvements/Sidewalk
Results
Less than $2,893,156 est. value
FL

Turkey Creek Road Project
Post-Bid
$3,000,000 est. value
Plant City, FL 33566

Montague Street at Memorial Highway Intersection Safety Improvements
Results
Less than $649,771 est. value
Tampa, FL 33601

Villages N and P Infrastructure Construction Project
Post-Bid
Tampa, FL

Asphalt Milling Services with Davis-Bacon Act Requirements
Results
Less than $650,000 est. value
Tampa, FL 33601

Lake Blanche Drive Extension - Phase 2
Post-Bid
Odessa, FL

Last Updated 06/28/2021 09:02 AM
Project Title

I-75 Big Bend Road

Physical Address View project details and contacts
City, State (County) FL   (Hillsborough County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of adding lanes and reconstruction of Big Bend Road from west of Covington Garden Drive to east of Simmons Loop, realignment and reconstruction of Old Big Bend Road from west of I-75 to east of I-75, I-75 widening and ramp reconstruction from south of Big Bend Road to north of Big Bend Road, and construction of a new roundabout at the proposed intersection of Old Big Bend Road and Bullfrog Creek Road.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents