Similar Projects
Annual Contract - Asphalt, Paving and Pathway Construction
Term Contract
Bidding
FL

Safety D/B Push Button for WWD Devices at Interstate Ramps
Bidding

Construct North 7th Street Sidewalk
Term Contract
Post-Bid
Lantana, FL 33462

Construction of 7th St. Heritage Alley Improvements
Post-Bid
West Palm Beach, FL

Palmetto Park Road from Southwest 7th Avenue to Southwest 5th Avenue
Results
Less than $4,950,000 est. value
FL

Loxahatchee River Road at the SFWMD C-18 Canal
Results
Less than $1,200,000 est. value
West Palm Beach, FL 33411

6th Avenue South Over Lake Osborne Drive
Bidding
Less than $8,800,000 est. value
FL

Resurfacing City of Pahokee Roadways - Phase III
Post-Bid
Pahokee, FL 33476

North Shore Neighborhoods and Citywide ADA Improvements
Results
West Palm Beach, FL

Florida Mango Road, Edgewater Drive to South of Barbados Road
Bidding
Less than $3,200,000 est. value
West Palm Beach, FL 33413

Park Asphalt Overlay and New Parking at John Stretch Memorial Park, Haverhill Park and Glades Pioneer Park
Post-Bid
Haverhill, FL 33415

WPB Callaway Resurface POV Parking
Results
West Palm Beach, FL 33406

Street Resurfacing and Miscellaneous Roadway Improvements
Term Contract
Bidding
$650,000 est. value
Jupiter, FL

Dixie Manor Apartments Sidewalk Replacement Project
Post-Bid
Boca Raton, FL 33432

Broadway and Blue Heron Block Redevelopment Project
Results
Riviera Beach, FL 33404

Reported 03/24/2021 12:00 AM
Project Title

Gateway Boulevard and Military Trail Intersection Improvements

Physical Address View project details and contacts
City, State (County) West Palm Beach, FL 33472   (Palm Beach County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $1,360,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of improvements at the intersection of Gateway Boulevard and Military Trail. A second southbound left turn lane, a new dedicated northbound right turn lane and an extension of the existing northbound left turn lane will be constructed at the intersection. Crosswalks, curb ramps and traffic signal mast arms at the four corners of the intersection will be upgraded part of this project. The proposed work also includes mobilization, maintenance of traffic, removal and installation of drainage structures, sidewalks, curbs and gutters, utilities, sodding and signalization. Soil disturbing activities will include clearing and grubbing, common excavation, compacted embankment, base, subgrade and pavement construction.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents