Similar Projects
Mirror Lake Drive Sidewalk, Drainage & Pavement Improvements
Post-Bid
Less than $1,600,000 est. value
Lake Placid, NY 12946

Bulwagga Bay Campground Shoreline Assessment and Remediation Plan
Post-Bid
Port Henry, NY 12974

Honey Hill Road Outfall Channel Restoration
Results
Fort Plain, NY

Zukowski Drive Drainage Improvements Phase 1
Results
Less than $300,000 est. value
Garnerville, NY

West Street Drainage Outlet Remediation
Post-Bid
Harrison, NY 10528

Monkey Run Road Culvert Replacement
Results
Port Crane, NY

Corrugated Metal Pipe Arches
Post-Bid
Fort Edward, NY 12828

Mirror Lake Drive Sidewalk, Drainage and Pavement Improvements
Results
Less than $1,100,000 est. value
Lake Placid, NY

Culvert and Underdrain Pipe and Tubing W/ Arches Bands and Accessories
Term Contract
Post-Bid

Replacement of Hannibal Street over Meadow Brook
Term Contract
Results
Fulton, NY 13069

Reconstruction of the Newark Street Drainage Culvert
Term Contract
Post-Bid
Lindenhurst, NY 11757

Richbell Road Drainage Improvements at Ridgeway to Ethelridge Road
Results
White Plains, NY

Culvert Replacement Project CR23 (Brook Road) Over Slade Creek, Saratoga Springs
Post-Bid
Ballston Spa, NY 12020

River Road Drainage
Results
Less than $560,000 est. value
Esopus, NY 12429

Corrugated Metal Pipe Arches and Aluminized Pipe Arches
Post-Bid
Owego, NY 13827

Last Updated 07/24/2020 08:56 AM
Project Title

Gooseberry Creek Revitalization Strategy – Creek Walk Park

Physical Address View project details and contacts
City, State (County) Tannersville, NY   (Greene County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contract No. 1 – General Site Work Contract No. 2 – Shade Structure Work The scope of work includes, but is not limited to, construction of approximately 100 feet of concrete seating wall with natural stone veneer, natural stone slab stairs, the stabilization and formalization of stream bank through the placement of large boulders along approximately 35 feet of the shoreline, installation of natural stone pavers, fabrication of a custom shade structure, landscape plantings, site furnishings and electrical work including lighting fixtures.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents