Last Updated | 10/13/2023 08:36 AM |
Project Title | Urban Runoff Management Project |
Physical Address | View project details and contacts |
City, State (County) | Chowchilla, CA 93610 (Madera County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected December 2023 |
Bids Due | View project details and contacts |
Estimated Value | $3,100,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Contract Time shall be sixty (60) calendar days, and liquidated damages for delay shall accrue. See Agreement Between Owner and Contractor for more information. Inquiries regarding this project should be directed to the Engineer no later than Thursday, October 5th, 2023 at: spencer.supinger@qkinc.com. Scope of work includes, but it not limited to, installation of storm drain piping, manholes, drain inlets, underground storm drain chamber system, hydraulic separator, landscape and irrigation, and other items as shown on the plans and specifications. Contractor promises and agrees, at its own cost and expense, to furnish to the Owner all labor, materials, tools, equipment, services, and incidental and customary work necessary to complete the Project including all structures and facilities fully and adequately necessary for the Project or described in the Contract (hereinafter the Work or Project), for a Total Contract Price as specified pursuant to this Contract. All Work shall be subject to, and performed in accordance with the above referenced documents, as well as the exhibits attached hereto and incorporated herein by reference. The plans and specifications for the Work are further described in the Exhibits attached hereto and incorporated herein by this reference. Special conditions, if any, relating to the Work are described in the Exhibits attached hereto and incorporated herein by this reference. Scope of work includes, but it not limited to, installation of storm drain piping, manholes, drain inlets, underground storm drain chamber system, hydraulic separator, landscape and irrigation, and other items as shown on the plans and specifications. 2.6. PROJECT: A. Install a minimum of six thousand six hundred (6,600) linear feet of storm drain, a minimum of twenty (20 manholes/junctions, and a minimum of six (6) catch basin inlets. B. Install a minimum of one (1) diversion structure with a minimum design flow rate of six (6) cubic feet per second. C. Install a minimum of on (1) hydrodynamic separator with a minimum design flow rate of six (6) cubic feet per second. D. Install a minimum of one (1) subsurface infiltration gallery with a minimum design storage capacity of sixty-one thousand (61,000) cubic feet. E. Install a minimum of five hundred (500) square feet of rain gardens. F. Install a minimum of seven (7) trees and restore a minimum of twenty thousand (20,000) square feet of park turf |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |