Architect-Engineer - Air Field Pavement Design MATOC
New Construction, Term Contract
Bidding

Parks Highway Bridge Replacements
New Construction, Infrastructure
Bidding
$20,000,000 to $30,000,000 est. value
AK

Engineering, Planning and Development
Post-Bid

Overflow Parking Design
Infrastructure
Post-Bid
AK

A-E Shortlist for USDA-FS, Region 8 and 10, SRS-PNW-LITF Research Stations 2021
New Construction
Results

Architectural/Engineer Services for DSJ Gym Floor Replacement Design
Alteration
Results
Matanuska, AK

FAA Airport Traffic Control Tower Design Competition
New Construction
Bidding

Kachemak Selo School Schematic Design
New Construction, Infrastructure
Post-Bid
$15,400,000 est. value
AK

Point MacKenzie Rail Extension Bridge Repairs
Renovation, Alteration
Results
Matanuska, AK

Synopsis Notice - W9128f22r0014 $30M Unr AE Afp Design MATOC
New Construction, Term Contract
Bidding
Less than $30,000,000 est. value

Perform Modifications to the M/V Tustumena, including Temporary Services
Term Contract
Post-Bid
$5,000,000 to $10,000,000 est. value

Design Services for Emergency Services Facility
New Construction
Results
Less than $5,000,000 est. value
Palmer, AK

Central Landfill Engineering Services
Infrastructure
Post-Bid
Palmer, AK

Remove Lead Based Paint From Bradley Bridge Girders
Alteration
Results
Less than $25,000 est. value
Trapper Creek, AK

Seldon Extension Phase 2 Right of Way Mapping
Infrastructure
Post-Bid
Wasilla, AK 99654

Last Updated 11/08/2021 02:11 PM
Project Title

Construction Management Services for Port MacKenzie Rail Bridge Repairs

Physical Address View project details and contacts
City, State (County) Big Lake, AK   (Matanuska-Susitna County)
Category(s) Heavy and Highway, Professional Services
Sub-Category(s) Bridge, Engineering
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide construction management for the repairs on railroad bridges along the Port MacKenzie Rail Extension near Big Lake, Alaska. The project scope is to repair and rehabilitate seven (7) bridges that sustained damage as a result of the earthquake in 2018. The required repairs include formed concrete repair, crack repair, handrail replacement, embankment filling around the substructure and resetting of the superstructure to open gaps at the ends of the spans. Three (3) of the Seven (7) structures require substantial repairs that involve disassembling the bridges to perform the repair and reassembling the structures to match their pre-earthquake design function.

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents