Similar Projects
Perform Modifications to the M/V Tustumena, including Temporary Services
Term Contract
Results
$5,000,000 to $10,000,000 est. value

Engineering, Planning and Development
Post-Bid

Overflow Parking Design
Infrastructure
Post-Bid
AK

Construction Management Services for Port MacKenzie Rail Bridge Repairs
Renovation, Infrastructure
Results
Big Lake, AK

Architectural/Engineer Services for DSJ Gym Floor Replacement Design
Alteration
Results
Matanuska, AK

Bike and Pedestrian Plan
Term Contract
Bidding
AK

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Design
Less than $98,000,000 est. value

A-E Shortlist for USDA-FS, Region 8 and 10, SRS-PNW-LITF Research Stations 2021
New Construction
Results

Design Services for Emergency Services Facility
New Construction
Results
Less than $5,000,000 est. value
Palmer, AK

Architect-Engineer - Air Field Pavement Design MATOC
New Construction, Term Contract
Post-Bid

Kachemak Selo School Schematic Design
New Construction, Infrastructure
Post-Bid
$15,400,000 est. value
AK

Unr AE Afp Design MATOC
New Construction, Term Contract
Post-Bid
Less than $30,000,000 est. value

Design Central Landfill Road Access Improvements
Infrastructure
Results
Less than $150,000 est. value
Palmer, AK

Central Landfill Engineering Services
Infrastructure
Results
Palmer, AK

FAA Airport Traffic Control Tower Design Competition
New Construction
Bidding

Last Updated 11/16/2021 08:08 AM
Project Title

Seldon Extension Phase 2 Right of Way Mapping

Physical Address View project details and contacts
City, State (County) Wasilla, AK 99654   (Matanuska-Susitna County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Qualified surveying firms to produce a Right-of-Way (ROW) Acquisition map for the proposed Seldon Road Extension - Phase 2 project near Wasilla, Alaska. The design for this project is in progress and much of the survey and ROW acquisition work has been previously completed, including field surveys, base mapping and creation of parcel plats. The ROW Acquisition map has not been generated, however, the survey data and drawings previously obtained and developed will be made available to the selected consultant for use in completing the ROW mapping, as appropriate. ROW acquisitions are nearly complete with 17 of the 18 necessary parcels acquired. The parcel plat for the final affected property is complete, but may need revisions as negotiations progress. See scope of services for detail.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents