Similar Projects
FAA Airport Traffic Control Tower Design Competition
New Construction
Bidding

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Bidding
Less than $98,000,000 est. value

Engineering, Planning and Development
Post-Bid

Overflow Parking Design
Infrastructure
Post-Bid
AK

A-E Shortlist for USDA-FS, Region 8 and 10, SRS-PNW-LITF Research Stations 2021
New Construction
Results

Architectural/Engineer Services for DSJ Gym Floor Replacement Design
Alteration
Results
Matanuska, AK

Regional A-E Environmental Services
Renovation, Term Contract
Bidding

Kachemak Selo School Schematic Design
New Construction, Infrastructure
Post-Bid
$15,400,000 est. value
AK

Construction Management Services for Port MacKenzie Rail Bridge Repairs
Renovation, Infrastructure
Results
Big Lake, AK

Alaska A&E IDIQ Contract
New Construction, Term Contract
Bidding

Architect-Engineer - Air Field Pavement Design MATOC
New Construction, Term Contract
Post-Bid

Design Services for Emergency Services Facility
New Construction
Results
Less than $5,000,000 est. value
Palmer, AK

Unr AE Afp Design MATOC
New Construction, Term Contract
Post-Bid
Less than $30,000,000 est. value

Design Central Landfill Road Access Improvements
Infrastructure
Results
Less than $150,000 est. value
Palmer, AK

Perform Modifications to the M/V Tustumena, including Temporary Services
Term Contract
Results
$5,000,000 to $10,000,000 est. value

Reported 12/01/2021 12:00 AM
Project Title

Bike and Pedestrian Plan

Physical Address View project details and contacts
City, State (County) AK   (Matanuska-Susitna County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Professional planning consultant to supply major components of the borough-wide, non-motorized, Bike and Pedestrian Plan (BPP). The MSB Planning Department wants to produce a plan that highlights the gaps in the current urban trail and paved pathway network, and provides a prioritized list of projects needed to develop a more connected system of urban trails with linkages to community centers, recreation areas, and backcountry trailheads.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents