Similar Projects
Bally's Casino / Chicago
LEED Certification, New Construction, Infrastructure
Design
$1,700,000,000 CJ est. value
Chicago, IL 60654

Water Main Replacement
Design
Elmwood Park, IL

Uptown Parking CRT Rehab
Post-Bid
Park Ridge, IL

Construction Various Width Pavement Resurfacing W/ Hot-Mix Surface Course Mix D, N50, 1-1/2" (184 Ton)
Post-Bid
Palos Heights, IL

Berwyn Depot District Utility Improvements
Results
Less than $11,765,090 est. value
Berwyn, IL

Terminal Area Fire Main Relocation - Lower Level Utility and Pavement Reconstruction
Results
Chicago, IL

Lincoln Yards South Package A-1 & B
Construction
Chicago, IL 60632

Auburn Park Station & Parking Facility
New Construction, Alteration - 4,678 SF
Construction
Chicago, IL 60620

State Street Mixed-Use Tower / Near North Side
Demolition, New Construction, Infrastructure - 10,000 SF
Pending Verification
$50,000,000 CJ est. value
Chicago, IL 60610

State Street Mixed-Use Tower / Near North Side
Demolition, New Construction, Infrastructure - 10,000 SF
Pending Verification
$50,000,000 CJ est. value
Chicago, IL 60610

Valve Exercising Program
Post-Bid
Glenview, IL

Pavement Resurfacing
Results
Less than $2,760,387 est. value
Palatine, IL

2021 Paving
Post-Bid
Schaumburg, IL

Crack Filling/Seal Coating/Striping at Triphahn Center Parking
Results
Hoffman Estates, IL 60169

Milling 46,440 SY of Existing Asphalt and Replacement
Post-Bid
Park Ridge, IL

Last Updated 09/22/2022 12:11 PM
Project Title

Russet Way (Crestwood Drive to Carousel Drive) - Village of Glenview

Physical Address View project details and contacts
City, State (County) Glenview, IL 60062   (Cook County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $679,937 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Typical work involves street removal, curb removal, underground utility installation/replacement/relining/repairs, public utility relocations, curb installation, sidewalk replacement, roadway base repair, street pavement installation, parkway grading, and landscape restoration. There will be a total of 2.62 miles reconstructed in 2021. The roadways include: Russet Way (Crestwood Drive to Carousel Drive) As of September 22, 2022, this project is currently in the Village of Glenview FY 2021- 2025 CIP. Information regarding design team and contractor selection has not been disclosed. A firm timeline has not been established.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents