Similar Projects
Parkhaus Development
New Construction
Conception
New Braunfels, TX 78130

White Oak Mixed Use Development
New Construction
Conception
Houston, TX 77009

Royal Caribbean Cruise Terminal
New Construction - 170,000 SF
Design
Galveston, TX 77550

Office Building & Parking Garage
New Construction - 240,000 SF
Design
$10,000,000 CJ est. value
Dallas, TX 75254

CMR for DM at Capitol Complex Garages
Renovation
Bidding
$4,000,000 est. value
Austin, TX 78711

Life Time Fitness
New Construction - 253,000 SF
Post-Bid
$130,000,000 est. value
Shenandoah, TX

Women & Children's Bed Tower and Associated Projects - Package 12
New Construction - 570,000 SF
Post-Bid
$10,000,000 CJ est. value
San Antonio, TX 78229

Parking Garage III
Results
El Paso, TX

Pressler Street Garage 2 - Design Build
Results
$21,500,000 est. value
Houston, TX 77030

Stacy Green
New Construction
Construction
Allen, TX 75013

St. Anne Catholic Community
New Construction - 151,400 SF
Construction
$19,000,000 est. value
Houston, TX 77098

4411 San Felipe Mixed Use
New Construction
Pending Verification
Houston, TX 77027

One City View
New Construction - 85,000 SF
Design
$60,000,000 est. value
Dallas, TX 75201

Asphalt Parking Replacement
Post-Bid
Carthage, TX 75633

City Hall Annex Garage - Structural Repairs - Hurricane Harvey
Results
$283,000 est. value
Houston, TX

Last Updated 06/22/2021 08:28 AM
Project Title

South Campus Parking Garage 2 - CMR

Physical Address View project details and contacts
City, State (County) Houston, TX 77000   (Harris County)
Category(s) Heavy and Highway
Sub-Category(s) Parking Garage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $35,960,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work include the design and construction of the South Campus Parking Garage No. 2. At present, this facility is anticipated to be a free-standing structure of approximately 645,000 gross square feet that will provide approximately 1,700 parking spaces, which is located between Bertner Avenue and Cambridge Street, south of Old Spanish Trail. HUB Goal 21.1%.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment.
Division 21 - Fire Suppression.
Division 26 - Electrical, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents