Similar Projects
Heritage Bay Government Center - Phase 2
New Construction, Infrastructure
Design
$11,000,000 CJ est. value
Naples, FL 34102

Youth Haven Intake Center
New Construction, Infrastructure - 3,500 SF
Bidding
$1,000,000 CJ est. value
Naples, FL 34112

Annual Street Resurfacing
Infrastructure
Bidding
$1,882,000 CJ est. value
Marco Island, FL 34145

10th Street North Landscape and Irrigation Improvements
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Naples, FL 34103

10th Street North Landscape and Irrigation Improvements
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Naples, FL 34103

Pelican Bay Sidewalk Replacement Phase 1
Post-Bid
$709,000 est. value
Naples, North Naples, FL

Resurfacing Courts at Various County Parks Project
Post-Bid
Naples, FL

Fakahatchee Strand Preserve State Park - Big Cypress Parking Improvements
Results
$4,800,000 est. value
Copeland, FL 34137

Mandarin Road Loop Water Main Connection
Results
Less than $356,435 est. value
Jacksonville, FL 32223

Temple Shalom Community Facility - Sitework
New Construction
Construction
$100,000 est. value
Naples, FL 34116

St. Matthew's House Renovation
Addition, New Construction, Renovation, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Naples, FL 34112

Logan Boulevard and Treeline Drive Intersection Improvements
Infrastructure
Bidding
$1,332,000 est. value
Naples, FL

Paver Maintenance
Post-Bid
Naples, FL

Inlet Drive Shared Pathway (From Travida Terrace To Addison Court)
Results
Marco Island, FL 34145

Golden Gate City Transmission Water Main Improvements - Phase 1
Infrastructure
Bidding
$14,380,000 CJ est. value
Golden Gate, FL 34116

Last Updated 08/01/2022 03:08 PM
Project Title

Sidewalk/Milling and Resurfacing/Base Work

Physical Address View project details and contacts
City, State (County) Everglades City, FL 34139   (Collier County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $4,361,899 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As per the Owner all bids have been rejected. Editorial Content Team is actively seeking updated information. Counties: Collier Road Name: Copeland Ave and Sr 90 (Us 41) Limits: From Chokoloskee Bay Br to N of Broadway Ave and at Oasis Visitor Center Project(s): 43709615201(*) Federal Aid No: D122028B Project(s): 44197515201 Federal Aid No: D122029B Total Roadway Length: 2.036 Miles Contract Days: 250 Total Bridge Length: 0.000 Miles Total Proposal Length: 2.036 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 60 Days (Aqui Time) The improvements under this contract consist of sidewalk construction, drainage improvements, highway signing and other incidental construction along Copeland Avenue (CR 29) from Chokoloskee Bay Bridge to N of Broadway Ave. SR 90 (US 41) at Oasis Visitor Center consists of widening, guardrail work, milling and resurfacing, striping, highway signing and other incidental construction in Collier County For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 005 - Sidewalk/Milling and Resurfacing/Base Work

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents