Similar Projects
Windermere Ward Trail - Town of Windermere
Infrastructure
Conception
Less than $2,590,000 est. value
Windermere, FL

Windermere Ward Trail - Town of Windermere
Infrastructure
Conception
Less than $2,590,000 est. value
Windermere, FL

Orange Technical College Winter Park Campus Replacement Project
New Construction, Renovation, Infrastructure
Design
$40,000,000 CJ est. value
Winter Park, FL 32789

Lake Copeland Apartments
New Construction, Infrastructure - 13,200 SF
Design
$13,000,000 CJ est. value
Orlando, FL 32806

Hurston Towers ADA Restroom Upgrades Project Phase 1
Renovation
Post-Bid
Orlando, FL 32801

Y-- (MATOC) for Design-Build Construction Services
New Construction, Renovation, Demolition
Post-Bid
$500,000 to $20,000,000 est. value

Y--Design-Build/Design-Bid-Build Indefinite Delivery/Indefinite Quantity Firm Fixed Price Multiple Award Construction Contract, NAVFAC SE Area of Operations
Results
$20,000,000 to $900,000,000 est. value

Easterly Wetlands Boardwalk
Results
$1,000,000 est. value
Orlando, FL 32802

JetBlue Orlando Support Center Expansion
New Construction - 50,000 SF
Construction
Orlando, FL

Floridian Town Center
New Construction, Infrastructure - 290,000 SF
Construction
$500,000,000 CJ est. value
Apopka, FL 32712

Gem Groves
New Construction, Infrastructure
Pending Verification
$65,000,000 CJ est. value
Winter Garden, FL 34787

Gem Groves
New Construction, Infrastructure
Pending Verification
$65,000,000 CJ est. value
Winter Garden, FL 34787

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

Christian Brothers Automotive / Ocoee - Rebid
New Construction, Infrastructure - 4,561 SF
Post-Bid
$1,200,000 CJ est. value
Ocoee, FL 34761

Construction of the Back to Nature Wildlife Refuge Center
New Construction - 6,830 SF
Results
Less than $3,700,000 est. value
Orlando, FL 32832

Last Updated 02/20/2023 07:12 AM
Project Title

RFQ Construction Manager at Risk - West Bus Compound New Ancillary Project

Physical Address View project details and contacts
City, State (County) Orlando, FL 32801   (Orange County)
Category(s) Government/Public, Heavy and Highway, Transportation
Sub-Category(s) Misc. Buildings, Misc. Structures, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected August 2024
Bids Due View project details and contacts
Estimated Value $20,800,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**The owner has determined a prequalified list of construction managers.** Major elements of the project include: 1. A new West Bus Compound which will house and facilitate the ongoing maintenance and operation of the OCPS vehicle fleet for the west area of the district on 20 +/-acres. 2. The West Bus Compound will include fleet maintenance offices, a 10-bay bus maintenance building, bus wash facilities, fueling facilities, and a drivers' lounge. Parking at the facility shall accommodate approximately 200 buses and 220 staff vehicles. The selected site will be unoccupied during construction. Target Schedule: Pre-construction Services Commencement: February 2023 Construction Notice to Proceed: April 2024 Substantial Completion: June 2025 The School Board of Orange County, Florida, does not discriminate in admission or access to, or treatment or employment in its programs and activities, on the basis of race, color, religion, age, sex, national origin, marital status, disability, genetic information, sexual orientation, gender identity or expression, or any other reason prohibited by law. The following individuals at the Ronald Blocker Educational Leadership Center, 445 West Amelia Street, Orlando, Florida 32801, attend to compliance matters: Equal Employment Opportunity (EEO) Officer & Title IX Coordinator: Keshara Cowans; ADA Coordinator: Jay Cardinali; Section 504 Coordinator: Tajuana Lee-Wenze. (407.317.3200) Major elements of the project include: 1. A new West Bus Compound which will house and facilitate the ongoing maintenance and operation of the OCPS vehicle fleet for the west area of the district on 20 +/-acres. 2. The West Bus Compound will include fleet maintenance offices, a 10-bay bus maintenance building, bus wash facilities, fueling facilities, and a drivers' lounge. Parking at the facility shall accommodate approximately 200 buses and 220 staff vehicles. The selected site will be unoccupied during construction. The estimated construction cost is $20,800,000

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Protective Covers, Transportation Stop Shelters.
Division 12 - Furnishings, Multiple Seating, Pews and Benches, Benches.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents