Similar Projects
Asphalt and Sidewalk Rehabilitation
Infrastructure
Bidding

Concrete and Asphalt Restoration Services
Infrastructure
Post-Bid
Orlando, FL

Mill Creek Apartments - ADA Upgrades
Renovation
Post-Bid
Orlando, FL 32822

Repave And Restripe The Gardenia Parking Lot
Results
Orlando, FL 32839

Tosohatchee (Viewing Platform at MUD Canal)
Results
Less than $202,000 est. value
Christmas, FL 32709

SheltAir FBO Parking Lot Expansion
Addition
Construction
Orlando, FL 32803

Orlando Urban Trail Gap and Extension Project
Results
Less than $3,622,289 est. value
Orlando, FL 32802

Mercy and WD Judge Drive Crosswalks
Results
Less than $285,595 est. value
Orlando, FL 32808

Lighting
Results
Less than $141,736 est. value
FL

Construction Services for the Sidewalk Safety Improvement Program
Term Contract
Results
$3,470,725 est. value
FL

Shingle Creek Regional Trail Phase 1 Segment 3 (from Taft-Vineland Road at Central Florida Parkway to State Road 528)
Results
$4,434,791 est. value
Orlando, FL 32813

Southwood Community Center Parking Lot Renovation
Infrastructure
Results
$727,000 est. value
Orlando, FL 32809

Pine Hills Road Pedestrian Safety Improvements
Infrastructure
Results
$17,927,185 est. value
Orlando, FL 32800

Orange County Infrastructure Repair and Replacement
Infrastructure
Results
$12,034,975 est. value
FL

Shingle Creek Regional Trail Phase 1, Segment 2 (from S.R. 528 to Destination Parkway)
Infrastructure
Results
$5,709,711 est. value
FL

Last Updated 02/01/2022 08:55 AM
Project Title

Easterly Wetlands Boardwalk

Physical Address View project details and contacts
City, State (County) Orlando, FL 32802   (Orange County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Contract will consist of the construction of approximately 2,200 linear feet of 6’ wide wooden boardwalk across a shallow manmade wetland pond that is approximately 1.5’ deep with some areas that are up to 3’ deep. The boardwalk project consists of two separate alignments that have very gradual, long radius “S” curves that intersect near Landing #2 of the three landings.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents