Similar Projects
Shingle Creek Regional Trail Phase 1, Segment 2 (from S.R. 528 to Destination Parkway)
Infrastructure
Bidding
$5,709,711 est. value
FL

SheltAir FBO Parking Lot Expansion
Addition
Post-Bid
Orlando, FL 32803

Sidewalk Concrete Repairs and Construction
Term Contract
Results
$1,000,000 est. value
Orlando, FL 32802

Airport Gap Trail
Results
Less than $500,036 est. value
Orlando, FL 32802

East 5th Street Public Parking Construction
Results
Apopka, FL 32703

Road Improvements for Remington Community Development District
Results
$745,000 est. value
Orlando, FL 32801

Orange County Infrastructure Repair and Replacement
Term Contract
Results
Orlando, FL

Repave And Restripe The Gardenia Parking Lot
Results
Orlando, FL 32839

Roadbase, Asphalt, Curb, Gutter and Miscellaneous Concrete Repairs
Term Contract
Results
Less than $3,933,175 est. value
Orlando, FL 32801

Tosohatchee (Viewing Platform at MUD Canal)
Results
Less than $202,000 est. value
Christmas, FL 32709

Orlando Urban Trail Gap and Extension Project
Results
Less than $3,622,289 est. value
Orlando, FL 32802

Mercy and WD Judge Drive Crosswalks
Results
Less than $285,595 est. value
Orlando, FL 32808

Lighting
Results
Less than $141,736 est. value
FL

Construction Services for the Sidewalk Safety Improvement Program
Term Contract
Results
$3,470,725 est. value
FL

Shingle Creek Regional Trail Phase 1 Segment 3 (from Taft-Vineland Road at Central Florida Parkway to State Road 528)
Results
$4,434,791 est. value
Orlando, FL 32813

Last Updated 07/26/2021 06:47 AM
Project Title

Orange County Infrastructure Repair and Replacement

Physical Address View project details and contacts
City, State (County) FL   (Orange County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $12,034,975
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed shall consist of the removal and replacement of existing damaged infrastructure including sidewalks, curb, gutter, driveway approaches, and pedestrian ramps. On occasion, the work may consist of the construction of new sidewalk in areas where there is no previous sidewalk or removal of asphalt up to 4" deep, to include adding or removing excess soil to accommodate installation of 4" or 6" concrete to designated elevation.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents