Similar Projects
Pedestrian Safety Improvement - SR 500
Infrastructure
Bidding
$3,811,673 est. value
FL

Concrete and Asphalt Restoration Services
Infrastructure
Post-Bid
Orlando, FL

Mill Creek Apartments - ADA Upgrades
Renovation
Post-Bid
Orlando, FL 32822

Sidewalk Concrete Repairs and Construction
Term Contract
Results
$1,000,000 est. value
Orlando, FL 32802

Road Improvements for Remington Community Development District
Results
$745,000 est. value
Orlando, FL 32801

SheltAir FBO Parking Lot Expansion
Addition
Construction
Orlando, FL 32803

Repave And Restripe The Gardenia Parking Lot
Results
Orlando, FL 32839

Roadbase, Asphalt, Curb, Gutter and Miscellaneous Concrete Repairs
Term Contract
Results
Less than $3,933,175 est. value
Orlando, FL 32801

Tosohatchee (Viewing Platform at MUD Canal)
Results
Less than $202,000 est. value
Christmas, FL 32709

Orlando Urban Trail Gap and Extension Project
Results
Less than $3,622,289 est. value
Orlando, FL 32802

Mercy and WD Judge Drive Crosswalks
Results
Less than $285,595 est. value
Orlando, FL 32808

Lighting
Results
Less than $141,736 est. value
FL

Construction Services for the Sidewalk Safety Improvement Program
Term Contract
Results
$3,470,725 est. value
FL

Shingle Creek Regional Trail Phase 1 Segment 3 (from Taft-Vineland Road at Central Florida Parkway to State Road 528)
Results
$4,434,791 est. value
Orlando, FL 32813

Southwood Community Center Parking Lot Renovation
Infrastructure
Results
$727,000 est. value
Orlando, FL 32809

Last Updated 11/10/2021 05:21 AM
Project Title

Pine Hills Road Pedestrian Safety Improvements

Physical Address View project details and contacts
City, State (County) Orlando, FL 32800   (Orange County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $17,927,185
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The construction of raised median throughout Pine Hills Road from S.R. 50 (Colonial Drive) to Bonnie Brae Circle. This involves pedestrian safety improvements throughout, including constructing of a 12’ sidewalk along the east side of the road from S.R. 438 (Silver Star Road) to Bonnie Brae Circle. Also included is upgrading curb ramps and driveways to meet ADA requirements. The project includes mast arm signalization upgrades at 7 intersections. The utility improvements will include the relocation of 193 lineal feet of 6-inch DI water main, 212 lineal feet of 8-inch DI water main, 1,266 lineal feet of 4-inch PVC force main, 2,005 lineal feet of 8-inch PVC force main and lining one (1) manhole.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents