Similar Projects
Last Updated | 05/02/2022 09:55 AM |
Project Title | Construct SOF 65 SOS Infrastructure and Security Building 90131 |
Physical Address | View project details and contacts |
City, State (County) | Hurlburt Field, FL 32544 (Okaloosa County) |
Category(s) | Government/Public |
Sub-Category(s) | Misc. Buildings |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,000,000 to $5,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Construct SOF 65 SOS Infrastructure and Security Building 90131. The work includes the following and incidental related work. a. Civil: The Civil site work consists of an 8' tall chain link fence with single barbed wire and privacy screen will surround the MCGS's. There will be two turnstiles, a 16' wide chain link swing gate and 5 removable bollards and 3 permanent bollards. Government provided and Contractor installed Jersey Barriers will surround the remaining perimeter. b. Structural: Project includes the addition of a new pre-engineered metal building structure bearing on a shallow foundation system. The metal building system has approximate dimensions of 33'-0" x 90'-0". This new mono-slope canopy has a roof slope of 1-1/2" per 1'-0" and has an approximate eave height of 12'-0". The foundation system shall consist of a 6" reinforced concrete slab with isolated concrete pilasters bearing on spread foundations. The new slab shall be doweled into the existing slab prior to placement. c. Architecture: Provide an approximately 2,800SF open-air/Pre-engineered metal building shade structure to accommodate five self-contained and occupied equipment trailers. This shade structure will include a structural standing seam metal roof, and bird netting below. Provide gutters and downspouts that will discharge onto existing hard surface. d. Electrical: A new 208V, 3 phase electrical service shall be installed to serve the new GCS equipment. The primary electrical system will be extended from an existing pad mount transformer nearby. The new service equipment will also include an emergency backup generator and ATS. New LED lighting will be provided under the canopy and around the perimeter for security. PDS infrastructure shall be installed from the Secure Server Room inside Building 90131 to the new GCS area for GFGI low voltage cabling. PDS will be installed exterior of the building. All work in secure areas shall comply with IC Tech Spec - for ICD/ICS 705. |
||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |