Similar Projects
Doral Pedestrian Bridge Design Build
Bidding
$4,800,000 est. value
Doral, FL

Bridge Replacement - SR A1A
New Construction, Infrastructure
Bidding
$91,021,542 est. value
FL

Bridge-Preventative Maintenance and Emergency Repair Services
Term Contract
Post-Bid
Dunedin, Indian Shores, Tarpon Springs, FL

2021 Bridge Repairs
Post-Bid
Saint Pete Beach, FL 33706

Southwest 42nd Avenue Over Coral Gables Canal Bridge No. 874275 Beam Repairs
Results
Less than $84,658 est. value
Miami, FL 33128

Palm Boulevard Pedestrian Bridge
Results
Port Saint Joe, FL 32456

Design Build Adjusted Score For I-75 (SR 93) at SR 951, Collier Co
New Construction, Infrastructure
Bidding
$77,073,946 est. value
FL

Design-Build Services for Bridge Mitigation Improvements (McCoy`s Creek) Raise Bridges -Stockton and King-PQ-Marine or Horizontal
Post-Bid
Jacksonville, FL 32204

BGL 20th Street Pedestrian Bridge
Results
Port Saint Joe, FL 32456

Donald Ross Road Bascule Bridge
New Construction, Infrastructure
Bidding
$7,000,000 est. value
FL

Design Build-Step 1-Golden Gate Pkwy over Santa Barbara Canal Bridge Replacement
Post-Bid
Less than $5,200,000 est. value
FL

BGL Mid-Bridge Pedestrian Bridge
Results
Port Saint Joe, FL 32457

Construction, 70th Street Over Delaney Creek
New Construction, Infrastructure
Bidding
$1,518,055 est. value
Tampa, FL 33619

Construction Services for Project Improvements Bella Vita Subdivision Phase 1B-1 and 1B-2 Berry Lane Bridge over Horse Creek
Post-Bid
FL

Bascule Bridge Maintenance and Emergency Response Repair Services
Term Contract
Results
Tampa, FL

Reported 01/05/2022 12:05 PM
Project Title

Indian Creek Ranch Road Bridge

Physical Address View project details and contacts
City, State (County) FL   (Walton County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Project Delayed
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a new 102 foot, 3 span bridge and concrete bridge approach. The prefabricated concrete deck that has been designed is a Conecuh Bridge system and has poured in place pile caps and Steel Piles for support. The asphalt roadway and guardrail construction will be performed by Walton County and is not a part of this project. The project also includes the construction of rip rap for stabilization of the Bruce Creek banks and sodding for roadside stabilization. The contractor shall keep all storage and materials within the 60’ easement that has been acquired by Walton County. Erosion control will be monitored closely since the DEP and ACOE permits require installation and maintaining throughout construction.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents