Similar Projects
Granada Pedestrian Bridge - B-000005 - City of Madera
New Construction, Infrastructure
Conception
$1,725,000 CJ est. value
Madera, CA 93637

Granada Pedestrian Bridge - B-000005 - City of Madera
New Construction, Infrastructure
Conception
$1,725,000 CJ est. value
Madera, CA 93637

AutoZone #1132 / Madera
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Berenda, CA 93637

Creek Fire Beasore Road Repairs
Infrastructure
Bidding
$10,000,000 CJ est. value
Oakhurst, CA 93644

Creek Fire Beasore Road Repairs
Infrastructure
Bidding
$10,000,000 CJ est. value
Oakhurst, CA 93644

Cold Plane AC, Place RHMA-G and HMA (Type A)
Infrastructure
Post-Bid
$2,150,000 est. value
CA

CA Flap 03S11(1) Reds Meadow Road
Term Contract
Post-Bid
CA

RHMA and HMA Paving, Modify Signal and Lighting Systems
Infrastructure
Results
$1,470,000 est. value
Madera, CA

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Sunset Apartments
Demolition, New Construction, Infrastructure, Build-out - 40,000 SF
Pending Verification
$5,500,000 CJ est. value
Madera, CA 93637

Sunset Apartments
Demolition, New Construction, Infrastructure, Build-out - 40,000 SF
Pending Verification
$5,500,000 CJ est. value
Madera, CA 93637

Bike/Ped Path, FRT-Cleveland Avenue - PK-00056 - City of Madera
Infrastructure
Conception
$310,000 CJ est. value
Madera, CA 93637

Gser Nelder Grove Stewardship Irsc
New Construction, Infrastructure
Bidding
$500,000 CJ est. value
Oakhurst, CA 93644

Minor B Small Business Remove and Replace HMA
Infrastructure
Post-Bid
$221,000 est. value
CA

Bell Avenue Complete Street Rehabilitation Project
Infrastructure
Results
$4,163,870 est. value

Last Updated 06/16/2023 07:34 AM
Project Title

GAOA Sierra Vista Scenic Byway, Sky Ranch Road

Physical Address View project details and contacts
City, State (County) Oakhurst, CA 93644   (Madera County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Amendment A00001 127EAW23R0011 - GAOA Sierra Vista Scenic Byway, Sky Ranch Road The purpose of this solicitation amendment is to answers all RFIs, provide associated revisions to the RFP document, and extend the proposal due date. Failure to use the revised documents and requirements within will result in your proposal being non-responsive. Proposal due date / time is hereby extended to NLT May 15, 2023, 1300 PST. See attached continuation pages for full details. 127EAW23R0011 - GAOA Sierra Vista Scenic Byway, Sky Ranch Road Sierra National Forest FAR 32.204 Disclosure of Magnitude of the Construction Project: Between $1,000,000 and $5,000,000. Set Aside: Total Small Business Set Aside IMPORTANT NOTES: See Section L, Paragraph L.2 for the Documents to Submit with Your Proposal All Requests for Information (RFI's) shall be submitted to the Contract Specialist, Tanya Torres, on the attached RFI form not later than 1300 hours PST, April 14th, 2023. A FS organized Pre-proposal conference will be held, see Section L.4 of the solicitation for details. The project location is open to the public and can be visited by each prospective offeror. In no event shall failure to inspect the site constitute grounds for a claim after contract award. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents