Similar Projects
RFQ Developer - Facility Condition Assessment for Lane County Parks
Renovation, Infrastructure
Conception
$500,000 CJ est. value
Eugene, OR 97401

Martin Luther King Jr. Boulevard Transit and Safety Improvements - City of Eugene
Infrastructure
Conception
$600,000 CJ est. value
Eugene, OR 97401

28th Street: Main St to Olympic St (Springfield)
Infrastructure
Design
$1,716,000 est. value
Springfield, OR 97475

S. 28th Street Dust Mitigation (Springfield)
Infrastructure
Design
$1,289,156 CJ est. value
Springfield, OR 97477

Susan Campbell Sidewalk Improvement Project
Infrastructure
Post-Bid
Eugene, OR 97403

Downtown Riverfront Southern Access and Parking
Infrastructure
Post-Bid
$2,300,000 to $2,700,000 est. value
Eugene, OR 97408

OR47/Territorial RD Curb Ramps (Carlton/Veneta) Project On The Tualatin Valley
Infrastructure
Results
$2,000,000 to $5,000,000 est. value

OR569: Green Hill Rd - Coburg Rd (Eugene) Section of the Beltline and Eugene-Springfield Highway (Rt. No. OR569 and I-105) in Eugene
Infrastructure
Results
$10,000,000 to $20,000,000 est. value
Eugene, OR

YMCA / Eugene
New Construction, Infrastructure
Construction
$34,000,000 CJ est. value
Eugene, OR 97405

Microtel by Wyndham
New Construction, Infrastructure - 37,256 SF
Pending Verification
$12,000,000 CJ est. value
Florence, OR 97439

Microtel by Wyndham
New Construction, Infrastructure - 37,256 SF
Pending Verification
$12,000,000 CJ est. value
Florence, OR 97439

Lincoln Street Protected Bike Lanes - City of Eugene
Infrastructure
Conception
$1,288,000 CJ est. value
Eugene, OR 97401

Coburg Loop - N. Coburg Industrial Way
Infrastructure
Design
$499,877 CJ est. value
Fall Creek, OR 97438

Camas Ridge Community Elementary School
New Construction, Demolition, Infrastructure - 74,500 SF
Post-Bid
$17,000,000 est. value
Eugene, OR 97403

OR58: Salt Creek Tunnel to MP 70 Section of the Willamette Highway (Rt. No. OR58) Near Odell Lake
Infrastructure
Results
$5,000,000 to $10,000,000 est. value

Last Updated 04/07/2023 01:36 AM
Project Title

Maxwell Road and Prairie Road (Eugene)

Physical Address View project details and contacts
City, State (County) Eugene, OR 97401   (Lane County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2024 , Construction documents
Bids Due View project details and contacts
Estimated Value $2,128,158 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide continuous walking route from River Road neighborhood and Bethel neighborhood, includes ADA access ramps, pedestrian countdown timers and APS, sidewalks, and crosswalks. As of April 07, 2023, the project is in Final Planning status. Anticipated Construction year is 2024. ODOT - Maxwell Road and Prairie Road (Eugene) *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents