Similar Projects
Jasper Trunk Sewer - Phase 3 - P21065 - City of Springfield
Infrastructure
Conception
$4,913,700 CJ est. value
Springfield, OR 97478

Jasper Trunk Sewer - Phase 3 - P21065 - City of Springfield
Infrastructure
Conception
$4,913,700 CJ est. value
Springfield, OR 97478

S. 28th Street Dust Mitigation (Springfield)
Infrastructure
Design
$1,289,156 CJ est. value
Springfield, OR 97477

S. 28th Street Dust Mitigation (Springfield)
Infrastructure
Design
$1,289,156 CJ est. value
Springfield, OR 97477

Dexter Fish Facility Upgrades Project
Infrastructure, Renovation
Bidding
$100,000,000 CJ est. value
Lowell, OR 97452

Dexter Fish Facility Upgrades Project
Infrastructure, Renovation
Bidding
$100,000,000 CJ est. value
Lowell, OR 97452

Camas Ridge Community Elementary School
New Construction, Demolition, Infrastructure - 74,500 SF
Post-Bid
$17,000,000 est. value
Eugene, OR 97403

Valve and Fitting
Infrastructure
Post-Bid
Springfield, OR

East Thomas Street Waterline Replacement
Infrastructure
Results
$200,000 to $225,000 est. value
Coburg, OR 97408

Polk Street Water Main Replacement
Infrastructure
Results
$300,000 est. value
Eugene, OR 97408

YMCA / Eugene
New Construction, Infrastructure
Construction
$34,000,000 CJ est. value
Eugene, OR 97405

Microtel by Wyndham
New Construction, Infrastructure - 37,256 SF
Pending Verification
$12,000,000 CJ est. value
Florence, OR 97439

2022 Bond - Street Repairs - City of Eugene
Infrastructure
Conception
$61,200,000 CJ est. value
Eugene, OR 97401

Coburg Loop - N. Coburg Industrial Way
Infrastructure
Design
$499,877 CJ est. value
Fall Creek, OR 97438

River Road at Irving Road
Infrastructure
Bidding
$2,200,000 CJ est. value
Eugene, OR 97404

Last Updated 12/21/2022 05:36 AM
Project Title

Wastewater Rehabilitation Harlow Laterals

Physical Address View project details and contacts
City, State (County) Eugene, OR 97401   (Lane County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $1,098,846 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work generally includes: Installation of CIPP liners in wastewater service laterals; Installation of connection liners at junction between wastewater mainline and service laterals; Video inspection and locating of wastewater service laterals; Temporary pedestrian and traffic control 1,867 FT CIPP Service Lateral Liner, 4 Inch; 3,136 FT CIPP Service Lateral Liner, 6 Inch; 90 FT CIPP Service Lateral Liner, 8 Inch; 195 EA Service Line Video Inspection and Location, Launch Camera The Agency reserves the right to issue Addenda making changes or corrections to the Plans, Specifications or quantities. The Agency will provide Addenda only by publishing them on the OregonBuys website. (See 00110.05(e)). No additional notification of addendum issuance will be provided All work must be completed by October 15, 2022. The City may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids or to waive any specification or requirement upon a finding of the City that it is in the public interest to do so. For more information regarding this project, contact Jennah Maier at 541-852-2227 or jmaier@eugene-or.gov. Construction of Wastewater Rehabilitation Harlow Laterals, as called for in the Plans and Specifications and such additional Incidental Work as requested by the Engineer. The estimated project cost range is $850,000 to $1,050,000. The scope of work generally includes: - Installation of CIPP liners in wastewater service laterals - Installation of connection liners at junction between wastewater mainline and service laterals - Video inspection and locating of wastewater service laterals - Temporary pedestrian and traffic control *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents