Similar Projects
Lone Pine Elementary Asphalt Track Replacement
Renovation
Bidding
$500,000 est. value
Medford, OR 97504

Bill Riegel Park Phase 2 Site Improvements
Renovation, Infrastructure
Bidding
$350,000 to $450,000 est. value
Salem, OR 97317

Parks and Recreation and Playground Equipment, Installations and Related Goods and Services
New Construction
Post-Bid
Salem, OR

Milwaukie Bay Park Project
Renovation
Post-Bid
$325,000 est. value
Milwaukie, OR 97222

Chip Ross Natural Area Trail Construction
New Construction, Infrastructure
Results
$100,000 est. value
Corvallis, OR 97333

Mill Park Development Project - CMGC
Renovation
Results
$5,900,000 est. value
Portland, OR 97266

Southridge High School JV Softball Field Upgrades
Renovation
Bidding
$200,000 est. value
Beaverton, OR 97008

Jessie Mays Community Park Improvements Project
Renovation
Post-Bid
$300,000 est. value
North Plains, OR 97133

Harrison Park Copper Replacement
Renovation
Results
Portland, OR 97216

Construction Manager General Contractor (CMGC) - Waterfront Improvements Project
Infrastructure
Bidding
$3,000,000 est. value
Albany, OR

RFP Construction Manager - Construction Manager General Contractor (CMGC) Services: 53rd Avenue Park West
Alteration
Post-Bid
$10,500,000 est. value
Hillsboro, OR 97124

Errol Heights Park
Renovation
Results
Portland, OR 97206

Henderson Park Playground
New Construction, Infrastructure
Bidding
$120,000 est. value
Albany, OR 97321

Umpqua Dunes Campground - North Loop Rehabilitation
Renovation
Results
Winchester Bay, OR 97467

Cascade Middle School Replacement Project
Renovation
Bidding
$20,000,000 est. value
Eugene, OR 97402

Reported 06/01/2022 12:00 AM
Project Title

Jefferson High School Gym Bleacher Replacement

Physical Address View project details and contacts
City, State (County) Jefferson, OR 97352   (Marion County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $350,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Jefferson School District is soliciting bids for the Jefferson High School Gym Bleacher Replacement Project, in Jefferson, OR By no later than 4:00 p.m. local time on May 31st 2022, each bidder shall deliver to Jefferson School District Main District Office, at the same address as the bids were delivered to, the "First Tier Subcontractor Disclosure Form" contained in the bidding documents. This form shall be submitted regardless of the bid total. Bidders who fail to submit the required disclosure form will be considered non-responsive, and their bid will not be considered for award. The disclosure form shall either be submitted in the same envelope or email as the bid, or shall be submitted in a separate sealed envelope or email clearly marked "Disclosure Form for Jefferson High School Gym Replacement Project," showing the date and time of the disclosure submittal deadline, as well as the Bidders name. Bids must be accompanied by an unconditional certified check or a bid bond executed in favor of the Jefferson School District 14J in an amount not less than ten percent (10%) of the total amount of the bid per ORS 279C.385, to be forfeited as fixed and liquidated damages should the bidder fail or neglect to enter into a contract and provide suitable bond for the faithful performance of the work in the event the contract is awarded. All bidders shall comply with ORS 279C.800-870, Oregon Bureau of Labor and Industries (BOLI) requirements, and be licensed with the State of Oregon Construction Contractors Board as required by ORS 701.035 to 701.055. Each bid will contain a statement as to whether or not the bidder is a resident bidder as defined in ORS 279A.120. The Owner reserves the right to reject any and all bids, and to waive any technicalities or informalities in connection therewith. No bidder may withdraw his bid after the hour set for the opening thereof until the lapse of thirty (30)days from the bid opening.

Details

Park/Playground, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 12 - Furnishings, Telescoping Stands, Telescoping Bleachers.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents